Aloha All,

My engineer is pushing back on our design, which calls for a battery and
load center to be installed within 6ft of the water pump and filter, the
inverter is 7ft away. He is citing NEC 2020 210.8 and the need for GFCI
protection.

Now besides the practical reason for not doing this, I can not find a code
reference preventing our proposed location for the battery and load center.

This is for an off-grid new construction home with the PV equipment in the
garage, using a Sol-Ark 15k and Discover Rack Mount batteries.

Any input?

Aloha,

Lou Russo
Owner
[email protected]
Office - 808 345 6762
Spree Solar Systems LLC
CT-34322
_______________________________________________
List sponsored by Redwood Alliance

Pay optional member dues here: http://re-wrenches.org

List Address: [email protected]

Change listserver email address & settings:
http://lists.re-wrenches.org/options.cgi/re-wrenches-re-wrenches.org

There are two list archives for searching. When one doesn't work, try the other:
https://www.mail-archive.com/[email protected]/
http://lists.re-wrenches.org/pipermail/re-wrenches-re-wrenches.org

List rules & etiquette:
http://www.re-wrenches.org/etiquette.htm

Check out or update participant bios:
http://www.members.re-wrenches.org

Reply via email to