Thanks for all the info!!

What about other settings like pre-references, keyword assigments, and
list sorts? Do those come with, or do we need to manually do that?
Other then having the handy "connection", is this any different then
exporting a tempalte and importing it into the second project?

Thanks,
Ashley

On Dec 17, 12:01 am, "Stephane Ritchot (SR Web Media)"
<[email protected]> wrote:
> Hello Ashley,
> We are currently working with a master project and child project since
> version 5.5.
>
> In our master project, we reproduce a mock site to allow us to test the
> changes made in our content classes. Then, when satisfied with the result we
> push the changes to all child projects. That way we can achieve major
> modifications to all our sites by a click of button and then republish them.
>
> On crucial element that you need to understand is that when doing the update
> of the content classes, it does it to the whole folder of that content
> class. In other words, if you have content class A and B in the same content
> classes folder, when you'll want to push the changes of content class B,
> content class A will be pushed too because they both reside in the same
> content classes folder. (Hope this make sense the ways I explained it)
>
> Another thing that works for us is that we are using a file system to store
> our media assets. That way we get the versioning option and the size of the
> database project is not too high. The draw back, though, is that when you
> export your projects, you need to bring the file system with it.
>
> Hope this help but if you need more information, let me know!
>
> SR Web Media Inc.
>
> Stéphane Ritchot
> Conseiller Web
> [email protected]
>
>
>
> -----Original Message-----
> From: [email protected]
>
> [mailto:[email protected]] On Behalf Of UberGeekGirl
> Sent: December-16-08 8:50 AM
> To: RedDot CMS Users
> Subject: How do you use master projects and child projects
>
> Hi All,
>
> I know some of you RedDot veterans and power developers have a concept
> of Master Project and Child Projects in RedDot CMS. I assume this uses
> content class and asset sharing.
>
> I was wondering if you would be willing to give us bit more
> information on how you use these multiple projects together. I am
> interested especially in any information you have about how we can
> develop/test things out in a master project and only push the changes
> to the child project when they are ready... We are currently trying to
> figure out the best method of developing while editors are
> contributing content (development and migration in parallel). This
> method looks much more promising then our current, mistake prone,
> solution (just importing the template and re-working everything again)
>
> Thanks so much for any information!
> Ashley- Hide quoted text -
>
> - Show quoted text -
--~--~---------~--~----~------------~-------~--~----~
You received this message because you are subscribed to the Google Groups 
"RedDot CMS Users" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
For more options, visit this group at 
http://groups.google.com/group/RedDot-CMS-Users?hl=en
-~----------~----~----~----~------~----~------~--~---

Reply via email to