Good morning group:
This morning I uploaded a schematic of my layout that is already in
progress. I will photo what is completed sometime today.
The layout is built on 1 1/2" thk blue foam board. At this time it
is on the floor. Benchwork will come soon. The outer loop is
finished & trains are running. All track & turnouts will be
Shinohara Code #100.
As far as trains go I have 1 SHS 2-8-0, a switcher & 7 freight cars.
Also I have an AM GG-1, a switcher and a 5-car passenger set. All
are DCC with only the 2-8-0 with sound.
Money being as tight as it is will dictate when the next loop will be
placed. We moved from NJ to upstate NY in June of this year & are
house in NJ is still not sold. Been on market 9 months. As it takes
24 pieces of track per loop it will be a while,so,in the meantime I'm
scratch-building structures. As they are built I will also post pix.
Bill
ps; The only company that I know of that could promote S-Scale would
be Bachmann, however, it would be Sn42.
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/S-Scale/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/S-Scale/join
(Yahoo! ID required)
<*> To change settings via email:
mailto:[EMAIL PROTECTED]
mailto:[EMAIL PROTECTED]
<*> To unsubscribe from this group, send an email to:
[EMAIL PROTECTED]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/