On 10/03/10, RS-2 #34 finished building the next #252 train on the Terminal 
District Main Line. At the engine facility, the hostler made up 252's power by 
running FA-2 #50B onto the turntable from the Inbound, turning it, and placing 
it on the Outbound, then ran FB-2 #52A onto the turntable and lined it into the 
Outbound and coupled it to #50B. #252's power was made up, serviced and ready 
to go.

Next, the hostler ran FP-7 #12C from the morning inbound passenger train from 
the Coach Lead, turned it on the turntable, and placed it behind the Midday 
Mail power on the Service Track. The Terminal District yard engine switched and 
turned the passenger trains, turned any individual single-ended cars (combines, 
etc.) on the turntable and made up the Eastbound trains in the Coach Yard.

No trains have run as yet on 10/04/10. The passenger schedules will probably 
run later this evening, but #252 may have to wait until 10/05, when #251 is 
made up at Mooar Yard.

Bob Nicholson, GM, SHABBONA RR  _________________________


At Mooar Yard, yard engine RS-3 #37 placed yesterday's cars from #252 over to 
the Mooar Yard Main for the Humongous switch job. As of this writing, the 
Humongous switch job has not begun sorting out the cars and spotting them.

The passenger trains ran their regular schedules, on time

--- In [email protected], "shabbona_rr" <user141...@...> wrote:
>
> In addition to the locomotive assignments listed on 10/01/10, GP9 #42 remains 
> sidelined for driveline inspection and repairs.
> 
> On 10/02/10, Time Freight #252 ran from Terminal District to Mooar Yard with 
> RS-3 #37 in the locomotive consist with FA-2/FB-2 #'s 50B & 52A. RS-1 #33 
> made up the outbound train and remained on it for pickup and transport to 
> Terminal District on #251. 
> 
> After yarding the inbound train, #252's power proceeded to the engine house 
> and cut off #37, then turned on the wye. In the meantime, the yard crew 
> grabbed #37 and ran around #252's caboose and tacked it on the East end of 
> outbound # 242. Then the FA/FB set backed onto #33 on the outbound train, 
> where the road crew MU'ed it into the locomotive consist. After a proper air 
> test, #241 departed.
> 
> Meanwhile, at Terminal District, RS-2 #34 grabbed a caboose from the caboose 
> track and began making up the next day's #252. As #241 approached Terminal 
> District, #34 cleared up for it on the South Main Runaround. #241 brought its 
> train down the Pocket Track, cut off and took the engines to the Outbound 
> Engine Track. The yard engine then broke up the train into the North Storage 
> Yard.
> 
> At that time, Hours of Service caught up with the crews (I got tired and went 
> to bed), shutting down the RR. Also, the passenger trains had run on schedule.
> 
> Bob Nicholson, GM, SHABBONA RR  __________________________________
> 
> 
> --- In [email protected], "shabbona_rr" <user141771@> wrote:
> >
> > As of Friday, Oct. 1st, 2010, the following locomotive assignments are in 
> > effect on SHABBONA RR's 2nd District. 
> > 
> > RS-3 #37 will work East in consist on the next #252 to Mooar Yard where it 
> > will replace RS-1 #33, as the Mooar Yard switch engine. #33 will work in 
> > consist back to Terminal District on #251. 
> > 
> > Boiler-equipped RS-2 #34, which has been the assigned power on the Midday 
> > Mail trains, #'s 3 & 4, will replace boiler-equipped (for coach yard 
> > switching) RS-1 #30 as the Terminal District switch engine. Dual purpose 
> > F7A #19 and boiler-equipped F7B #19A will be the assigned power for #'s 3 & 
> > 4.
> > 
> > In serviceable storage are F2A #09A, F7B #15A, and F7A #18L. To be 
> > sidelined for inspection and repairs are RS-1's #30 & 33, and RS-3 #35. All 
> > other locomotive assignments remain unchanged.
> > 
> > Bob Nicholson, CMO & General Manager
> > SHABBONA RR  ______________________________________________
> >
>




------------------------------------

Yahoo! Groups Links

<*> To visit your group on the web, go to:
    http://groups.yahoo.com/group/S-Scale/

<*> Your email settings:
    Individual Email | Traditional

<*> To change settings online go to:
    http://groups.yahoo.com/group/S-Scale/join
    (Yahoo! ID required)

<*> To change settings via email:
    [email protected] 
    [email protected]

<*> To unsubscribe from this group, send an email to:
    [email protected]

<*> Your use of Yahoo! Groups is subject to:
    http://docs.yahoo.com/info/terms/

Reply via email to