Here are 2 photos of the Bar Mills "Majestic Hardware" that I have been working
on for a while. It is temporarily set on a foamcore pad that I
"unprototypically" set on the mainline. I have modified the building to add a
basement and large loading docks.
The other photo is the the first of 11 "modules" (or sections) for the new
layout. It is the throat for the 5 track lower staging yard. Turnouts are #6
by FastTracks in code 100. Ballast is only on the outsides until the track is
installed.
Terry Dillon
[Non-text portions of this message have been removed]
------------------------------------
Yahoo! Groups Links
<*> To visit your group on the web, go to:
http://groups.yahoo.com/group/S-Scale/
<*> Your email settings:
Individual Email | Traditional
<*> To change settings online go to:
http://groups.yahoo.com/group/S-Scale/join
(Yahoo! ID required)
<*> To change settings via email:
[email protected]
[email protected]
<*> To unsubscribe from this group, send an email to:
[email protected]
<*> Your use of Yahoo! Groups is subject to:
http://docs.yahoo.com/info/terms/