Edward Kenny wrote "(Someday) Modeling the DL&W in S scale circa 9/29/54."

I'm modeling the PRR on 10/15/54. If we we really slow our trains down, could 
they make a run through ! ! ? ?

Meanwhile, I have some real progress to report.

When I was little, the Christmas Eve ritual was to go down to the Pennsy 
station in Canton and pick up my grandparents, who would be arriving on the 
Trailblazer from Chicago. Forget Santa and his reindeer. Christmas was about 
passenger trains. This year I intend to replicate that in my basement.

The goal is to commemorate the Miracle of the Exploding Winerack (I think some 
of you have heard this inspiring Christmas legend from my basement) by running 
a PRR passenger train around the entire loop on Christmas Eve. I am getting 
very close!

With the help from a friend from work, I have been making huge progress on the 
layout. I have all but about 3 feet of the PRR main line loop laid. I also have 
the passing siding laid through the upper Mount Union yard. 

Tonight we worked on DCC wiring .By the end of the evening I was able to run a 
test train of my longest passenger cars (pulled by an F unit) and also my PRR 
I1 Decapod around key parts of the layout to test clearances and radii. 
Everything seems to be working as planned.

Stay tuned. My wife Ginny  is talking, somewhat prematurely, about the need to 
scratchbuild a golden spike. 

Lee Rainey

 

Reply via email to