I've taken advantage of very few, short-lived lulls in my industrial jobs to
work on the SAL B7 boxcar design.  As of today, about 70% of the CAD work is
done.  The kit will include new brake parts, new draft gear box (based on
John Degnan's design), new 5/6/5 door and new photo-etched (stainless steel)
stirrup steps, brake platform, roofwalk and side/end grabs.  

 

The design work that is completed includes the body, underframe, brake
parts, draft gear box, Ajax brake housing and tack boards.  Work that
remains includes the etched stirrups/grabs and the door.  Next week's
schedule appears to have about a day's worth of available time so I plan to
take advantage of that and knock out the etched parts.

 

All new parts will be added to my detail parts line once the boxcar kit is
in production.

 

Go to my web page (link is
http://www.smokymountainmodelworks.com/S_scale_kits.html) to view (3) hi-rez
pdf's made from CAD screen shots.

 

Jim King

President, Smoky Mountain Model Works, Inc.

Ph. (828) 777-5619

www.smokymountainmodelworks.com

 

Trainmaster, Craggy Mountain Line RR

www.craggymountainline.com

 

Reply via email to