Dear All

as convenor of the RP 2021 plan for saligao, i am pleased to announce 
that the RP 2021 for saligao has been revised and is now ready for 
public viewing and comments. new roads, forest area, heritage zones etc 
are some of the salient features of this new plan.
from omnday onwards, a hard copy will be kept open for display to the 
villages from 10 am - 6 pm onwards at the communidade. this will 
continue till saturday. from thursday onwards, ward wise visits will 
start in the evening at the communidade. where ward problems will be 
address and clarifications made.

a small note is being kept alongside the plan. which i am enclosing below.

the plan itself is avaliable as a soft copy which an be emailed to 
people on request only. it is a large 4.5 MB file so unless one is 
behind a fast internet connection pls do not ask e to download it as it 
will block ur mails.

please do create awareness about the same to ur near and dear ones at 
home in saligao so that all might come and see the plan.

an exact date for the gram sabha regading the RP wil be intimated later. 
i request ALL. even gaonkars from outside the village to come see the 
plan and atttened the gram sabha

regards
Ashley


Roads
1)Both main District roads ( MDR) to be maintained at present breath as 
it cannot be expanded furthur in most places. Only in certain areas 
where viable it will be extended. By proposing 12 meter roads for MDR. 
We ensure that NO development of any kind can be done from 6 meters from 
center of the road. It DOES not mean the road will be developed to a 
full carpet area of 12 meters.
2)6 meter Roads and 5 meter roads include shoulder of 1 meter pathways 
and drainage on either side and carpet area of remaining meters. 
Therefore an existing road like the St anne's chappel to peggy's corner 
road which is shown as 6 meters will NOT be extended further but is only 
provisioned for drainage and footpath on either side.
3)2 and 3 meter roads are actual carpet area and DO NOT include 
provision for footpaths. Only some where shown have drainage.

Settlement
1)All areas marked as proposed settlement in those areas where it is 
overlapping with slopes HAVE to be resurveyed before permission is given 
for settlement.
2)As fields CANNOT be converted to settlement, Illegal constructions/ 
Filling in these fields are not shown.
3)All Communidade bhands in the village have been proposed to be 
repaired and brought to their original width and in areas where 
possible, only 2 meters access to provide for easy access to mechanized 
farming like tractors.
4)We are Keeping proposed VP 2 Status for saligao which gives people a 
maximum built up area of 60 FAR.


-- 
Linux - You must break it | Windows - It breaks itself

Devine Computers
Abreovaddo, Saligao, Bardez, Goa.
Ph: 2409544 / 9823118321
Branch: Opp Municipality, Shetye resicom, Shop #3. Bicholim
Ph: 9422448900 / 2361147

--~--~---------~--~----~------------~-------~--~----~
This message comes via the Google Groups "Saligao-Net" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/saligao-net?hl=en
Please post regularly to keep the e-village active!
-~----------~----~----~----~------~----~------~--~---

  • ... Ashley Delaney
    • ... Frederick [FN] Noronha * फ्रेडरिक नोरोन्या
      • ... muriel & mario
      • ... Ashley Delaney
    • ... Cordeiro Salvador

Reply via email to