> as convenor of the RP 2021 plan for saligao, i am pleased to announce
> that the RP 2021 for saligao has been revised and is now ready for
> public viewing and comments. new roads, forest area, heritage zones etc
> are some of the salient features of this new plan.
> from omnday onwards, a hard copy will be kept open for display to the
> villages from 10 am - 6 pm onwards at the communidade. this will
> continue till saturday. from thursday onwards, ward wise visits will
> start in the evening at the communidade. where ward problems will be
> address and clarifications made.
>
> a small note is being kept alongside the plan. which i am enclosing below.
>
> the plan itself is avaliable as a soft copy which an be emailed to
> people on request only. it is a large 4.5 MB file so unless one is
> behind a fast internet connection pls do not ask e to download it as it
> will block ur mails.
>
> please do create awareness about the same to ur near and dear ones at
> home in saligao so that all might come and see the plan.
>
> an exact date for the gram sabha regading the RP wil be intimated later.
> i request ALL. even gaonkars from outside the village to come see the
> plan and atttened the gram sabha
>
> regards
> Ashley
>
>
> Roads
> 1)Both main District roads ( MDR) to be maintained at present breath as
> it cannot be expanded furthur in most places. Only in certain areas
> where viable it will be extended. By proposing 12 meter roads for MDR.
> We ensure that NO development of any kind can be done from 6 meters from
> center of the road. It DOES not mean the road will be developed to a
> full carpet area of 12 meters.
> 2)6 meter Roads and 5 meter roads include shoulder of 1 meter pathways
> and drainage on either side and carpet area of remaining meters.
> Therefore an existing road like the St anne's chappel to peggy's corner
> road which is shown as 6 meters will NOT be extended further but is only
> provisioned for drainage and footpath on either side.
> 3)2 and 3 meter roads are actual carpet area and DO NOT include
> provision for footpaths. Only some where shown have drainage.
>
> Settlement
> 1)All areas marked as proposed settlement in those areas where it is
> overlapping with slopes HAVE to be resurveyed before permission is given
> for settlement.
> 2)As fields CANNOT be converted to settlement, Illegal constructions/
> Filling in these fields are not shown.
> 3)All Communidade bhands in the village have been proposed to be
> repaired and brought to their original width and in areas where
> possible, only 2 meters access to provide for easy access to mechanized
> farming like tractors.
> 4)We are Keeping proposed VP 2 Status for saligao which gives people a
> maximum built up area of 60 FAR.
>
>
> --
> Linux - You must break it | Windows - It breaks itself
>
> Devine Computers
> Abreovaddo, Saligao, Bardez, Goa.
> Ph: 2409544 / 9823118321
> Branch: Opp Municipality, Shetye resicom, Shop #3. Bicholim
> Ph: 9422448900 / 2361147
>
> >
>



-- 
FN * http://fredericknoronha.wordpress.com
M +91-9822122436 P +91-832-2409490 http://twitter.com/fn
On Facebook: http://www.new.facebook.com/people/Frederick-Noronha/502514643

--~--~---------~--~----~------------~-------~--~----~
This message comes via the Google Groups "Saligao-Net" group.
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to
[email protected]
For more options, visit this group at
http://groups.google.com/group/saligao-net?hl=en
Please post regularly to keep the e-village active!
-~----------~----~----~----~------~----~------~--~---

  • ... Ashley Delaney
    • ... Frederick [FN] Noronha * फ्रेडरिक नोरोन्या
      • ... muriel & mario
      • ... Ashley Delaney
    • ... Cordeiro Salvador

Reply via email to