Re: PRs done but Jiras not updated to reflect completion

2019-08-29 Thread Justin Leet
If you want a quick way to check, you can abuse one of the release utils a
bit.

E.g. this will basically do the prerelease check, and spit out a list of
tickets. Any ticket with a FIX link to the Jira can be updated.
./dev-utilities/release-utils//validate-jira-for-release -v="Next + 1"
-s="tags/apache-metron_0.7.1-release" | grep "Justin Leet"

Here's an unsorted, current list for anyone interested. Sidenote, I created
https://jira.apache.org/jira/browse/METRON-2242 if anyone wants to improve
the script's usability a bit. It's just to improve the script output so
it's easily sorted by contributor and such.

METRON-2179 In Progress   Shane
Ardell  https://issues.apache.org/jira/browse/METRON-2179
METRON-2205 In Progress   Tibor
Meller  https://issues.apache.org/jira/browse/METRON-2205
METRON-2192Done
Unassigned  https://issues.apache.org/jira/browse/METRON-2192
METRON-2191Done   Tibor
Meller  https://issues.apache.org/jira/browse/METRON-2191
METRON-2172   To Do Nick
Allen  https://issues.apache.org/jira/browse/METRON-2172
METRON-2185DoneOtto
Fowler  https://issues.apache.org/jira/browse/METRON-2185
METRON-2174Done   Shane
Ardell  https://issues.apache.org/jira/browse/METRON-2174
METRON-2161Done   Shane
Ardell  https://issues.apache.org/jira/browse/METRON-2161
METRON-2183Done   Shane
Ardell  https://issues.apache.org/jira/browse/METRON-2183
METRON-2148   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2148
METRON-2150Done   Tibor
Meller  https://issues.apache.org/jira/browse/METRON-2150
METRON-2168   To Do Nick
Allen  https://issues.apache.org/jira/browse/METRON-2168
METRON-2061   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2061
METRON-2164 In Progress Nick
Allen  https://issues.apache.org/jira/browse/METRON-2164
METRON-2155   To Do Nick
Allen  https://issues.apache.org/jira/browse/METRON-2155
METRON-2156   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2156
METRON-2142   To Do
 Mohan  https://issues.apache.org/jira/browse/METRON-2142
METRON-1253   To DoTamas
Fodor  https://issues.apache.org/jira/browse/METRON-1253
METRON-2073   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2073
METRON-2092   To DoTamas
Fodor  https://issues.apache.org/jira/browse/METRON-2092
METRON-2153   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2153
METRON-2087Done  Ryan
Merriman  https://issues.apache.org/jira/browse/METRON-2087
METRON-2143   To Do Nick
Allen  https://issues.apache.org/jira/browse/METRON-2143
METRON-2109   To Do
Unassigned  https://issues.apache.org/jira/browse/METRON-2109
METRON-2085   To DoTamas
Fodor  https://issues.apache.org/jira/browse/METRON-2085
METRON-2058   To DoTamas
Fodor  https://issues.apache.org/jira/browse/METRON-2058
METRON-1997   To DoTamas
Fodor  https://issues.apache.org/jira/browse/METRON-1997
METRON-2089 In Progress   Tibor
Meller  https://issues.apache.org/jira/browse/METRON-2089
METRON-2106   To Do  Ryan
Merriman  https://issues.apache.org/jira/browse/METRON-2106

On Thu, Aug 29, 2019 at 12:47 PM Michael Miklavcic <
michael.miklav...@gmail.com> wrote:

> Hey all,
>
> I'm seeing quite a few Jiras that have been completed but not closed out
> and marked as done. Can the committers do a quick spin through their PRs
> and Jiras and check?:
>
>1. The reporter and assignee are correct (assignee should be the
>committer or contributor that did the PR - if you mark a Jira as done,
> it
>will set the assignee to your name automatically, so be sure to override
>that if it should be someone else)
>2. Version is set to Next +1 for upcoming release, or correct version if
>included in a previous release
>3. Marked as Done
>
> The release manager does a final walk through, but this should make
> Justin's life a lot easier next time we're ready to spin up another
> release.
>
> Cheers,
> Mike
>


PRs done but Jiras not updated to reflect completion

2019-08-29 Thread Michael Miklavcic
Hey all,

I'm seeing quite a few Jiras that have been completed but not closed out
and marked as done. Can the committers do a quick spin through their PRs
and Jiras and check?:

   1. The reporter and assignee are correct (assignee should be the
   committer or contributor that did the PR - if you mark a Jira as done, it
   will set the assignee to your name automatically, so be sure to override
   that if it should be someone else)
   2. Version is set to Next +1 for upcoming release, or correct version if
   included in a previous release
   3. Marked as Done

The release manager does a final walk through, but this should make
Justin's life a lot easier next time we're ready to spin up another release.

Cheers,
Mike