Re: Getting ready for Apache Camel 2.21 release

2018-03-09 Thread Claus Ibsen
Hi

Thanks Gregor, that sounds good.
I put out the word on twitter about "last call"

On Fri, Mar 9, 2018 at 9:50 AM, Gregor Zurowski
 wrote:
> Hi Claus,
>
> I am not sure if I have any capacity to start this before Sunday. So please
> take your time to finish your work.
>
> Thanks,
> Gregor
>
> On Mar 9, 2018 9:15 AM, "Claus Ibsen"  wrote:
>
>> Hi
>>
>> I have a bit more work on the camel-rabbitmq component I would like to
>> get done before we cut the release.
>> As I am traveling this morning I am not sure when I get a chance to do
>> a bit of coding.
>> But would have time later this afternoon.
>>
>> Gregor how is your timeline looking? Can you possible start the
>> release procedure tomorrow?
>>
>> If anyone got a bit of time it would be nice to pre-test the
>> 2.21.0-SNAPSHOT agains the source code for the CiA2 book.
>> We usually do that against the RCs but would be better to catch them
>> ahead of time if there is any issues.
>>
>>
>>
>> On Thu, Mar 8, 2018 at 8:13 AM, Claus Ibsen  wrote:
>> > Hi
>> >
>> > So the CI builds had 3 successfully builds recently
>> > https://builds.apache.org/job/Camel/job/master/
>> >
>> > The build #120 was hanging and I killed it, and it started a new build
>> #121.
>> > That build should have a fix that caused the previous builds to fail
>> > with due to a recent cdi-pax upgrade.
>> >
>> > We have today and tomorrow morning to get the bits in, before we hand
>> > it over to Gregor, to cut the release.
>> >
>> >
>> > On Tue, Mar 6, 2018 at 11:04 AM, Andrea Cosentino 
>> wrote:
>> >> Hello,
>> >>
>> >> Actually we have the SMX bundles release of February under vote. The
>> bundles are here:
>> >> https://issues.apache.org/jira/secure/ReleaseNote.jspa?
>> projectId=12311206=12342774
>> >>
>> >> I believe Saxon, gRPC and OkHttp 3.10 should be included in 2.21.0 (and
>> others maybe, but with less importance), the vote should close soon, I
>> should be able to update everything before Friday.
>> >>
>> >>
>> >>
>> >>
>> >> --
>> >> Andrea Cosentino
>> >> --
>> >> Apache Camel PMC Member
>> >> Apache Karaf Committer
>> >> Apache Servicemix PMC Member
>> >> Email: ancosen1...@yahoo.com
>> >> Twitter: @oscerd2
>> >> Github: oscerd
>> >>
>> >>
>> >>
>> >>
>> >>
>> >>
>> >> On Tuesday, March 6, 2018, 10:58:23 AM GMT+1, Claus Ibsen <
>> claus.ib...@gmail.com> wrote:
>> >>
>> >>
>> >>
>> >>
>> >>
>> >> Hi
>> >>
>> >> So this week we are closing in on getting ready for cutting the Camel
>> >> 2.21.0 release in the weekend.
>> >>
>> >> The CI server are doing many tests and we have improved and fixed some
>> >> of its failures, and also found some flaky tests that we have
>> >> disabled.
>> >> https://builds.apache.org/job/Camel/job/master/
>> >>
>> >> There are 10 JIRAs assigned for 2.21.0 and I will go over them
>> >> https://issues.apache.org/jira/issues/?jql=project%20%
>> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
>> 20statusCategory%20%3D%20new
>> >>
>> >> Some of these will be moved to 2.22.0 or 2.21.1.
>> >>
>> >> Otherwise we should focus on bug fixes, smaller improvements, polish
>> >> the docs, examples etc.
>> >>
>> >>
>> >> Andrea is there any SMX bundle release we potentially are waiting for?
>> >>
>> >>
>> >>
>> >> On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen 
>> wrote:
>> >>> Hi
>> >>>
>> >>> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger 
>> wrote:
>>  Hi,
>> 
>>   Just a quick note that I had a successful build this night on my
>> local
>>  machine too.
>> 
>> >>>
>> >>> Thanks for testing and reporting back.
>> >>>
>> >>>
>>  Alex
>> 
>>  On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen 
>> wrote:
>> 
>> > Hi
>> >
>> > We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21
>> is
>> > shorter and also what we would actually focus on.
>> > That said if there is something you really would like to get in 2.21
>> > that was moved to 2.22 then say so, and work on it.
>> > We have this week to work on improvements, new features etc. And then
>> > next week we should focus mostly on bug fixes, polishing, testing,
>> and
>> > fix up docs etc.
>> > And then Gregor will cut the release in the weekend (eg around March
>> > 9-11th)
>> >
>> > I ran tests overnight and found 3 issues which I have logged and
>> fixed
>> > this morning.
>> > So all tests pass on my laptop, but would also be good to have tested
>> > on other platforms.
>> >
>> > The CI servers are temporary disabled and we are migrating to Jenkins
>> > Pipeline to make the CI server jobs more faster and less resource
>> > intensive.
>> > There is another talk on @dev about this.
>> >
>> >
>> >
>> >
>> > On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 

Re: Getting ready for Apache Camel 2.21 release

2018-03-09 Thread Gregor Zurowski
Hi Claus,

I am not sure if I have any capacity to start this before Sunday. So please
take your time to finish your work.

Thanks,
Gregor

On Mar 9, 2018 9:15 AM, "Claus Ibsen"  wrote:

> Hi
>
> I have a bit more work on the camel-rabbitmq component I would like to
> get done before we cut the release.
> As I am traveling this morning I am not sure when I get a chance to do
> a bit of coding.
> But would have time later this afternoon.
>
> Gregor how is your timeline looking? Can you possible start the
> release procedure tomorrow?
>
> If anyone got a bit of time it would be nice to pre-test the
> 2.21.0-SNAPSHOT agains the source code for the CiA2 book.
> We usually do that against the RCs but would be better to catch them
> ahead of time if there is any issues.
>
>
>
> On Thu, Mar 8, 2018 at 8:13 AM, Claus Ibsen  wrote:
> > Hi
> >
> > So the CI builds had 3 successfully builds recently
> > https://builds.apache.org/job/Camel/job/master/
> >
> > The build #120 was hanging and I killed it, and it started a new build
> #121.
> > That build should have a fix that caused the previous builds to fail
> > with due to a recent cdi-pax upgrade.
> >
> > We have today and tomorrow morning to get the bits in, before we hand
> > it over to Gregor, to cut the release.
> >
> >
> > On Tue, Mar 6, 2018 at 11:04 AM, Andrea Cosentino 
> wrote:
> >> Hello,
> >>
> >> Actually we have the SMX bundles release of February under vote. The
> bundles are here:
> >> https://issues.apache.org/jira/secure/ReleaseNote.jspa?
> projectId=12311206=12342774
> >>
> >> I believe Saxon, gRPC and OkHttp 3.10 should be included in 2.21.0 (and
> others maybe, but with less importance), the vote should close soon, I
> should be able to update everything before Friday.
> >>
> >>
> >>
> >>
> >> --
> >> Andrea Cosentino
> >> --
> >> Apache Camel PMC Member
> >> Apache Karaf Committer
> >> Apache Servicemix PMC Member
> >> Email: ancosen1...@yahoo.com
> >> Twitter: @oscerd2
> >> Github: oscerd
> >>
> >>
> >>
> >>
> >>
> >>
> >> On Tuesday, March 6, 2018, 10:58:23 AM GMT+1, Claus Ibsen <
> claus.ib...@gmail.com> wrote:
> >>
> >>
> >>
> >>
> >>
> >> Hi
> >>
> >> So this week we are closing in on getting ready for cutting the Camel
> >> 2.21.0 release in the weekend.
> >>
> >> The CI server are doing many tests and we have improved and fixed some
> >> of its failures, and also found some flaky tests that we have
> >> disabled.
> >> https://builds.apache.org/job/Camel/job/master/
> >>
> >> There are 10 JIRAs assigned for 2.21.0 and I will go over them
> >> https://issues.apache.org/jira/issues/?jql=project%20%
> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
> 20statusCategory%20%3D%20new
> >>
> >> Some of these will be moved to 2.22.0 or 2.21.1.
> >>
> >> Otherwise we should focus on bug fixes, smaller improvements, polish
> >> the docs, examples etc.
> >>
> >>
> >> Andrea is there any SMX bundle release we potentially are waiting for?
> >>
> >>
> >>
> >> On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen 
> wrote:
> >>> Hi
> >>>
> >>> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger 
> wrote:
>  Hi,
> 
>   Just a quick note that I had a successful build this night on my
> local
>  machine too.
> 
> >>>
> >>> Thanks for testing and reporting back.
> >>>
> >>>
>  Alex
> 
>  On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen 
> wrote:
> 
> > Hi
> >
> > We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21
> is
> > shorter and also what we would actually focus on.
> > That said if there is something you really would like to get in 2.21
> > that was moved to 2.22 then say so, and work on it.
> > We have this week to work on improvements, new features etc. And then
> > next week we should focus mostly on bug fixes, polishing, testing,
> and
> > fix up docs etc.
> > And then Gregor will cut the release in the weekend (eg around March
> > 9-11th)
> >
> > I ran tests overnight and found 3 issues which I have logged and
> fixed
> > this morning.
> > So all tests pass on my laptop, but would also be good to have tested
> > on other platforms.
> >
> > The CI servers are temporary disabled and we are migrating to Jenkins
> > Pipeline to make the CI server jobs more faster and less resource
> > intensive.
> > There is another talk on @dev about this.
> >
> >
> >
> >
> > On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen  >
> > wrote:
> > > Hi
> > >
> > > We should start to close down and get ready for the expected Camel
> 2.21
> > release.
> > >
> > > If you have any new functionality then its last call to get that
> > > implemented and committed.
> > >
> > > There are currently 61 tickets [1] 

Re: Getting ready for Apache Camel 2.21 release

2018-03-09 Thread Claus Ibsen
Hi

I have a bit more work on the camel-rabbitmq component I would like to
get done before we cut the release.
As I am traveling this morning I am not sure when I get a chance to do
a bit of coding.
But would have time later this afternoon.

Gregor how is your timeline looking? Can you possible start the
release procedure tomorrow?

If anyone got a bit of time it would be nice to pre-test the
2.21.0-SNAPSHOT agains the source code for the CiA2 book.
We usually do that against the RCs but would be better to catch them
ahead of time if there is any issues.



On Thu, Mar 8, 2018 at 8:13 AM, Claus Ibsen  wrote:
> Hi
>
> So the CI builds had 3 successfully builds recently
> https://builds.apache.org/job/Camel/job/master/
>
> The build #120 was hanging and I killed it, and it started a new build #121.
> That build should have a fix that caused the previous builds to fail
> with due to a recent cdi-pax upgrade.
>
> We have today and tomorrow morning to get the bits in, before we hand
> it over to Gregor, to cut the release.
>
>
> On Tue, Mar 6, 2018 at 11:04 AM, Andrea Cosentino  
> wrote:
>> Hello,
>>
>> Actually we have the SMX bundles release of February under vote. The bundles 
>> are here:
>> https://issues.apache.org/jira/secure/ReleaseNote.jspa?projectId=12311206=12342774
>>
>> I believe Saxon, gRPC and OkHttp 3.10 should be included in 2.21.0 (and 
>> others maybe, but with less importance), the vote should close soon, I 
>> should be able to update everything before Friday.
>>
>>
>>
>>
>> --
>> Andrea Cosentino
>> --
>> Apache Camel PMC Member
>> Apache Karaf Committer
>> Apache Servicemix PMC Member
>> Email: ancosen1...@yahoo.com
>> Twitter: @oscerd2
>> Github: oscerd
>>
>>
>>
>>
>>
>>
>> On Tuesday, March 6, 2018, 10:58:23 AM GMT+1, Claus Ibsen 
>>  wrote:
>>
>>
>>
>>
>>
>> Hi
>>
>> So this week we are closing in on getting ready for cutting the Camel
>> 2.21.0 release in the weekend.
>>
>> The CI server are doing many tests and we have improved and fixed some
>> of its failures, and also found some flaky tests that we have
>> disabled.
>> https://builds.apache.org/job/Camel/job/master/
>>
>> There are 10 JIRAs assigned for 2.21.0 and I will go over them
>> https://issues.apache.org/jira/issues/?jql=project%20%3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%20statusCategory%20%3D%20new
>>
>> Some of these will be moved to 2.22.0 or 2.21.1.
>>
>> Otherwise we should focus on bug fixes, smaller improvements, polish
>> the docs, examples etc.
>>
>>
>> Andrea is there any SMX bundle release we potentially are waiting for?
>>
>>
>>
>> On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen  wrote:
>>> Hi
>>>
>>> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger  
>>> wrote:
 Hi,

  Just a quick note that I had a successful build this night on my local
 machine too.

>>>
>>> Thanks for testing and reporting back.
>>>
>>>
 Alex

 On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  
 wrote:

> Hi
>
> We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
> shorter and also what we would actually focus on.
> That said if there is something you really would like to get in 2.21
> that was moved to 2.22 then say so, and work on it.
> We have this week to work on improvements, new features etc. And then
> next week we should focus mostly on bug fixes, polishing, testing, and
> fix up docs etc.
> And then Gregor will cut the release in the weekend (eg around March
> 9-11th)
>
> I ran tests overnight and found 3 issues which I have logged and fixed
> this morning.
> So all tests pass on my laptop, but would also be good to have tested
> on other platforms.
>
> The CI servers are temporary disabled and we are migrating to Jenkins
> Pipeline to make the CI server jobs more faster and less resource
> intensive.
> There is another talk on @dev about this.
>
>
>
>
> On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
> wrote:
> > Hi
> >
> > We should start to close down and get ready for the expected Camel 2.21
> release.
> >
> > If you have any new functionality then its last call to get that
> > implemented and committed.
> >
> > There are currently 61 tickets [1] assigned to 2.21.0 release which is
> > too much. I will go over them and you are of course also welcome to
> > take a look, and move tickets to 2.21.1 or 2.22.0.
> >
> > I think we need to use this week to get the last tickets resolved,
> > bugs fixed, stable the CI tests and what else, and then we can touch
> > base in start of next week to plan for cutting the 2.21 RC builds.
> > Gregor do you have time for example from next week / next weekend to
> > cut the 

Re: Getting ready for Apache Camel 2.21 release

2018-03-07 Thread Claus Ibsen
Hi

So the CI builds had 3 successfully builds recently
https://builds.apache.org/job/Camel/job/master/

The build #120 was hanging and I killed it, and it started a new build #121.
That build should have a fix that caused the previous builds to fail
with due to a recent cdi-pax upgrade.

We have today and tomorrow morning to get the bits in, before we hand
it over to Gregor, to cut the release.


On Tue, Mar 6, 2018 at 11:04 AM, Andrea Cosentino  wrote:
> Hello,
>
> Actually we have the SMX bundles release of February under vote. The bundles 
> are here:
> https://issues.apache.org/jira/secure/ReleaseNote.jspa?projectId=12311206=12342774
>
> I believe Saxon, gRPC and OkHttp 3.10 should be included in 2.21.0 (and 
> others maybe, but with less importance), the vote should close soon, I should 
> be able to update everything before Friday.
>
>
>
>
> --
> Andrea Cosentino
> --
> Apache Camel PMC Member
> Apache Karaf Committer
> Apache Servicemix PMC Member
> Email: ancosen1...@yahoo.com
> Twitter: @oscerd2
> Github: oscerd
>
>
>
>
>
>
> On Tuesday, March 6, 2018, 10:58:23 AM GMT+1, Claus Ibsen 
>  wrote:
>
>
>
>
>
> Hi
>
> So this week we are closing in on getting ready for cutting the Camel
> 2.21.0 release in the weekend.
>
> The CI server are doing many tests and we have improved and fixed some
> of its failures, and also found some flaky tests that we have
> disabled.
> https://builds.apache.org/job/Camel/job/master/
>
> There are 10 JIRAs assigned for 2.21.0 and I will go over them
> https://issues.apache.org/jira/issues/?jql=project%20%3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%20statusCategory%20%3D%20new
>
> Some of these will be moved to 2.22.0 or 2.21.1.
>
> Otherwise we should focus on bug fixes, smaller improvements, polish
> the docs, examples etc.
>
>
> Andrea is there any SMX bundle release we potentially are waiting for?
>
>
>
> On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen  wrote:
>> Hi
>>
>> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger  wrote:
>>> Hi,
>>>
>>>  Just a quick note that I had a successful build this night on my local
>>> machine too.
>>>
>>
>> Thanks for testing and reporting back.
>>
>>
>>> Alex
>>>
>>> On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  wrote:
>>>
 Hi

 We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
 shorter and also what we would actually focus on.
 That said if there is something you really would like to get in 2.21
 that was moved to 2.22 then say so, and work on it.
 We have this week to work on improvements, new features etc. And then
 next week we should focus mostly on bug fixes, polishing, testing, and
 fix up docs etc.
 And then Gregor will cut the release in the weekend (eg around March
 9-11th)

 I ran tests overnight and found 3 issues which I have logged and fixed
 this morning.
 So all tests pass on my laptop, but would also be good to have tested
 on other platforms.

 The CI servers are temporary disabled and we are migrating to Jenkins
 Pipeline to make the CI server jobs more faster and less resource
 intensive.
 There is another talk on @dev about this.




 On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
 wrote:
 > Hi
 >
 > We should start to close down and get ready for the expected Camel 2.21
 release.
 >
 > If you have any new functionality then its last call to get that
 > implemented and committed.
 >
 > There are currently 61 tickets [1] assigned to 2.21.0 release which is
 > too much. I will go over them and you are of course also welcome to
 > take a look, and move tickets to 2.21.1 or 2.22.0.
 >
 > I think we need to use this week to get the last tickets resolved,
 > bugs fixed, stable the CI tests and what else, and then we can touch
 > base in start of next week to plan for cutting the 2.21 RC builds.
 > Gregor do you have time for example from next week / next weekend to
 > cut the RC?
 >
 >
 > [1] - https://issues.apache.org/jira/issues/?jql=project%20%
 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
 20statusCategory%20%3D%20new
 >
 >
 >
 >
 >
 > --
 > Claus Ibsen
 > -
 > http://davsclaus.com @davsclaus
 > Camel in Action 2: https://www.manning.com/ibsen2
>



 --
 Claus Ibsen
 -
 http://davsclaus.com @davsclaus
 Camel in Action 2: https://www.manning.com/ibsen2

>>
>>
>>
>> --
>> Claus Ibsen
>> -
>> http://davsclaus.com @davsclaus
>> Camel in Action 2: https://www.manning.com/ibsen2
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-03-06 Thread Andrea Cosentino
Hello,

Actually we have the SMX bundles release of February under vote. The bundles 
are here: 
https://issues.apache.org/jira/secure/ReleaseNote.jspa?projectId=12311206=12342774

I believe Saxon, gRPC and OkHttp 3.10 should be included in 2.21.0 (and others 
maybe, but with less importance), the vote should close soon, I should be able 
to update everything before Friday.




--
Andrea Cosentino 
--
Apache Camel PMC Member
Apache Karaf Committer
Apache Servicemix PMC Member
Email: ancosen1...@yahoo.com
Twitter: @oscerd2
Github: oscerd






On Tuesday, March 6, 2018, 10:58:23 AM GMT+1, Claus Ibsen 
 wrote: 





Hi

So this week we are closing in on getting ready for cutting the Camel
2.21.0 release in the weekend.

The CI server are doing many tests and we have improved and fixed some
of its failures, and also found some flaky tests that we have
disabled.
https://builds.apache.org/job/Camel/job/master/

There are 10 JIRAs assigned for 2.21.0 and I will go over them
https://issues.apache.org/jira/issues/?jql=project%20%3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%20statusCategory%20%3D%20new

Some of these will be moved to 2.22.0 or 2.21.1.

Otherwise we should focus on bug fixes, smaller improvements, polish
the docs, examples etc.


Andrea is there any SMX bundle release we potentially are waiting for?



On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen  wrote:
> Hi
>
> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger  wrote:
>> Hi,
>>
>>  Just a quick note that I had a successful build this night on my local
>> machine too.
>>
>
> Thanks for testing and reporting back.
>
>
>> Alex
>>
>> On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  wrote:
>>
>>> Hi
>>>
>>> We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
>>> shorter and also what we would actually focus on.
>>> That said if there is something you really would like to get in 2.21
>>> that was moved to 2.22 then say so, and work on it.
>>> We have this week to work on improvements, new features etc. And then
>>> next week we should focus mostly on bug fixes, polishing, testing, and
>>> fix up docs etc.
>>> And then Gregor will cut the release in the weekend (eg around March
>>> 9-11th)
>>>
>>> I ran tests overnight and found 3 issues which I have logged and fixed
>>> this morning.
>>> So all tests pass on my laptop, but would also be good to have tested
>>> on other platforms.
>>>
>>> The CI servers are temporary disabled and we are migrating to Jenkins
>>> Pipeline to make the CI server jobs more faster and less resource
>>> intensive.
>>> There is another talk on @dev about this.
>>>
>>>
>>>
>>>
>>> On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
>>> wrote:
>>> > Hi
>>> >
>>> > We should start to close down and get ready for the expected Camel 2.21
>>> release.
>>> >
>>> > If you have any new functionality then its last call to get that
>>> > implemented and committed.
>>> >
>>> > There are currently 61 tickets [1] assigned to 2.21.0 release which is
>>> > too much. I will go over them and you are of course also welcome to
>>> > take a look, and move tickets to 2.21.1 or 2.22.0.
>>> >
>>> > I think we need to use this week to get the last tickets resolved,
>>> > bugs fixed, stable the CI tests and what else, and then we can touch
>>> > base in start of next week to plan for cutting the 2.21 RC builds.
>>> > Gregor do you have time for example from next week / next weekend to
>>> > cut the RC?
>>> >
>>> >
>>> > [1] - https://issues.apache.org/jira/issues/?jql=project%20%
>>> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
>>> 20statusCategory%20%3D%20new
>>> >
>>> >
>>> >
>>> >
>>> >
>>> > --
>>> > Claus Ibsen
>>> > -
>>> > http://davsclaus.com @davsclaus
>>> > Camel in Action 2: https://www.manning.com/ibsen2

>>>
>>>
>>>
>>> --
>>> Claus Ibsen
>>> -
>>> http://davsclaus.com @davsclaus
>>> Camel in Action 2: https://www.manning.com/ibsen2
>>>
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-03-06 Thread Claus Ibsen
Hi

So this week we are closing in on getting ready for cutting the Camel
2.21.0 release in the weekend.

The CI server are doing many tests and we have improved and fixed some
of its failures, and also found some flaky tests that we have
disabled.
https://builds.apache.org/job/Camel/job/master/

There are 10 JIRAs assigned for 2.21.0 and I will go over them
https://issues.apache.org/jira/issues/?jql=project%20%3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%20statusCategory%20%3D%20new

Some of these will be moved to 2.22.0 or 2.21.1.

Otherwise we should focus on bug fixes, smaller improvements, polish
the docs, examples etc.


Andrea is there any SMX bundle release we potentially are waiting for?



On Sun, Mar 4, 2018 at 9:22 AM, Claus Ibsen  wrote:
> Hi
>
> On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger  wrote:
>> Hi,
>>
>>   Just a quick note that I had a successful build this night on my local
>> machine too.
>>
>
> Thanks for testing and reporting back.
>
>
>> Alex
>>
>> On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  wrote:
>>
>>> Hi
>>>
>>> We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
>>> shorter and also what we would actually focus on.
>>> That said if there is something you really would like to get in 2.21
>>> that was moved to 2.22 then say so, and work on it.
>>> We have this week to work on improvements, new features etc. And then
>>> next week we should focus mostly on bug fixes, polishing, testing, and
>>> fix up docs etc.
>>> And then Gregor will cut the release in the weekend (eg around March
>>> 9-11th)
>>>
>>> I ran tests overnight and found 3 issues which I have logged and fixed
>>> this morning.
>>> So all tests pass on my laptop, but would also be good to have tested
>>> on other platforms.
>>>
>>> The CI servers are temporary disabled and we are migrating to Jenkins
>>> Pipeline to make the CI server jobs more faster and less resource
>>> intensive.
>>> There is another talk on @dev about this.
>>>
>>>
>>>
>>>
>>> On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
>>> wrote:
>>> > Hi
>>> >
>>> > We should start to close down and get ready for the expected Camel 2.21
>>> release.
>>> >
>>> > If you have any new functionality then its last call to get that
>>> > implemented and committed.
>>> >
>>> > There are currently 61 tickets [1] assigned to 2.21.0 release which is
>>> > too much. I will go over them and you are of course also welcome to
>>> > take a look, and move tickets to 2.21.1 or 2.22.0.
>>> >
>>> > I think we need to use this week to get the last tickets resolved,
>>> > bugs fixed, stable the CI tests and what else, and then we can touch
>>> > base in start of next week to plan for cutting the 2.21 RC builds.
>>> > Gregor do you have time for example from next week / next weekend to
>>> > cut the RC?
>>> >
>>> >
>>> > [1] - https://issues.apache.org/jira/issues/?jql=project%20%
>>> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
>>> 20statusCategory%20%3D%20new
>>> >
>>> >
>>> >
>>> >
>>> >
>>> > --
>>> > Claus Ibsen
>>> > -
>>> > http://davsclaus.com @davsclaus
>>> > Camel in Action 2: https://www.manning.com/ibsen2
>>>
>>>
>>>
>>> --
>>> Claus Ibsen
>>> -
>>> http://davsclaus.com @davsclaus
>>> Camel in Action 2: https://www.manning.com/ibsen2
>>>
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-03-04 Thread Claus Ibsen
Hi

On Sun, Mar 4, 2018 at 9:19 AM, Alex Dettinger  wrote:
> Hi,
>
>   Just a quick note that I had a successful build this night on my local
> machine too.
>

Thanks for testing and reporting back.


> Alex
>
> On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  wrote:
>
>> Hi
>>
>> We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
>> shorter and also what we would actually focus on.
>> That said if there is something you really would like to get in 2.21
>> that was moved to 2.22 then say so, and work on it.
>> We have this week to work on improvements, new features etc. And then
>> next week we should focus mostly on bug fixes, polishing, testing, and
>> fix up docs etc.
>> And then Gregor will cut the release in the weekend (eg around March
>> 9-11th)
>>
>> I ran tests overnight and found 3 issues which I have logged and fixed
>> this morning.
>> So all tests pass on my laptop, but would also be good to have tested
>> on other platforms.
>>
>> The CI servers are temporary disabled and we are migrating to Jenkins
>> Pipeline to make the CI server jobs more faster and less resource
>> intensive.
>> There is another talk on @dev about this.
>>
>>
>>
>>
>> On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
>> wrote:
>> > Hi
>> >
>> > We should start to close down and get ready for the expected Camel 2.21
>> release.
>> >
>> > If you have any new functionality then its last call to get that
>> > implemented and committed.
>> >
>> > There are currently 61 tickets [1] assigned to 2.21.0 release which is
>> > too much. I will go over them and you are of course also welcome to
>> > take a look, and move tickets to 2.21.1 or 2.22.0.
>> >
>> > I think we need to use this week to get the last tickets resolved,
>> > bugs fixed, stable the CI tests and what else, and then we can touch
>> > base in start of next week to plan for cutting the 2.21 RC builds.
>> > Gregor do you have time for example from next week / next weekend to
>> > cut the RC?
>> >
>> >
>> > [1] - https://issues.apache.org/jira/issues/?jql=project%20%
>> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
>> 20statusCategory%20%3D%20new
>> >
>> >
>> >
>> >
>> >
>> > --
>> > Claus Ibsen
>> > -
>> > http://davsclaus.com @davsclaus
>> > Camel in Action 2: https://www.manning.com/ibsen2
>>
>>
>>
>> --
>> Claus Ibsen
>> -
>> http://davsclaus.com @davsclaus
>> Camel in Action 2: https://www.manning.com/ibsen2
>>



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-03-04 Thread Alex Dettinger
Hi,

  Just a quick note that I had a successful build this night on my local
machine too.

Alex

On Wed, Feb 28, 2018 at 10:34 AM, Claus Ibsen  wrote:

> Hi
>
> We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
> shorter and also what we would actually focus on.
> That said if there is something you really would like to get in 2.21
> that was moved to 2.22 then say so, and work on it.
> We have this week to work on improvements, new features etc. And then
> next week we should focus mostly on bug fixes, polishing, testing, and
> fix up docs etc.
> And then Gregor will cut the release in the weekend (eg around March
> 9-11th)
>
> I ran tests overnight and found 3 issues which I have logged and fixed
> this morning.
> So all tests pass on my laptop, but would also be good to have tested
> on other platforms.
>
> The CI servers are temporary disabled and we are migrating to Jenkins
> Pipeline to make the CI server jobs more faster and less resource
> intensive.
> There is another talk on @dev about this.
>
>
>
>
> On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen 
> wrote:
> > Hi
> >
> > We should start to close down and get ready for the expected Camel 2.21
> release.
> >
> > If you have any new functionality then its last call to get that
> > implemented and committed.
> >
> > There are currently 61 tickets [1] assigned to 2.21.0 release which is
> > too much. I will go over them and you are of course also welcome to
> > take a look, and move tickets to 2.21.1 or 2.22.0.
> >
> > I think we need to use this week to get the last tickets resolved,
> > bugs fixed, stable the CI tests and what else, and then we can touch
> > base in start of next week to plan for cutting the 2.21 RC builds.
> > Gregor do you have time for example from next week / next weekend to
> > cut the RC?
> >
> >
> > [1] - https://issues.apache.org/jira/issues/?jql=project%20%
> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
> 20statusCategory%20%3D%20new
> >
> >
> >
> >
> >
> > --
> > Claus Ibsen
> > -
> > http://davsclaus.com @davsclaus
> > Camel in Action 2: https://www.manning.com/ibsen2
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2
>


Re: Getting ready for Apache Camel 2.21 release

2018-02-28 Thread Claus Ibsen
Hi

We have now moved some JIRA tickets to 2.22 so the roadmap for 2.21 is
shorter and also what we would actually focus on.
That said if there is something you really would like to get in 2.21
that was moved to 2.22 then say so, and work on it.
We have this week to work on improvements, new features etc. And then
next week we should focus mostly on bug fixes, polishing, testing, and
fix up docs etc.
And then Gregor will cut the release in the weekend (eg around March 9-11th)

I ran tests overnight and found 3 issues which I have logged and fixed
this morning.
So all tests pass on my laptop, but would also be good to have tested
on other platforms.

The CI servers are temporary disabled and we are migrating to Jenkins
Pipeline to make the CI server jobs more faster and less resource
intensive.
There is another talk on @dev about this.




On Mon, Feb 26, 2018 at 10:10 AM, Claus Ibsen  wrote:
> Hi
>
> We should start to close down and get ready for the expected Camel 2.21 
> release.
>
> If you have any new functionality then its last call to get that
> implemented and committed.
>
> There are currently 61 tickets [1] assigned to 2.21.0 release which is
> too much. I will go over them and you are of course also welcome to
> take a look, and move tickets to 2.21.1 or 2.22.0.
>
> I think we need to use this week to get the last tickets resolved,
> bugs fixed, stable the CI tests and what else, and then we can touch
> base in start of next week to plan for cutting the 2.21 RC builds.
> Gregor do you have time for example from next week / next weekend to
> cut the RC?
>
>
> [1] - 
> https://issues.apache.org/jira/issues/?jql=project%20%3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%20statusCategory%20%3D%20new
>
>
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-02-27 Thread Claus Ibsen
On Mon, Feb 26, 2018 at 8:06 PM, Gregor Zurowski
 wrote:
> Hi,
>
> Yes, I am available for cutting the release next week.
>

Thanks, we will keep you updated here on the @dev mailing list.


> Thanks,
> Gregor
>
>
> On Feb 26, 2018 10:10 AM, "Claus Ibsen"  wrote:
>
> Hi
>
> We should start to close down and get ready for the expected Camel 2.21
> release.
>
> If you have any new functionality then its last call to get that
> implemented and committed.
>
> There are currently 61 tickets [1] assigned to 2.21.0 release which is
> too much. I will go over them and you are of course also welcome to
> take a look, and move tickets to 2.21.1 or 2.22.0.
>
> I think we need to use this week to get the last tickets resolved,
> bugs fixed, stable the CI tests and what else, and then we can touch
> base in start of next week to plan for cutting the 2.21 RC builds.
> Gregor do you have time for example from next week / next weekend to
> cut the RC?
>
>
> [1] - https://issues.apache.org/jira/issues/?jql=project%20%
> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
> 20statusCategory%20%3D%20new
>
>
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-02-27 Thread Claus Ibsen
Hi

Spring Boot 2 is planned for Camel 2.22 release.
We would like to work for being able to release Camel 2.22 a bit
sooner than usual, maybe around summer.


On Mon, Feb 26, 2018 at 2:04 PM, David Karlsen  wrote:
> It would be super-nice if camel could do a release supporting spring-boot
> 2.x quite close to boot 2.x releasing!
>
> 2018-02-26 10:10 GMT+01:00 Claus Ibsen :
>
>> Hi
>>
>> We should start to close down and get ready for the expected Camel 2.21
>> release.
>>
>> If you have any new functionality then its last call to get that
>> implemented and committed.
>>
>> There are currently 61 tickets [1] assigned to 2.21.0 release which is
>> too much. I will go over them and you are of course also welcome to
>> take a look, and move tickets to 2.21.1 or 2.22.0.
>>
>> I think we need to use this week to get the last tickets resolved,
>> bugs fixed, stable the CI tests and what else, and then we can touch
>> base in start of next week to plan for cutting the 2.21 RC builds.
>> Gregor do you have time for example from next week / next weekend to
>> cut the RC?
>>
>>
>> [1] - https://issues.apache.org/jira/issues/?jql=project%20%
>> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
>> 20statusCategory%20%3D%20new
>>
>>
>>
>>
>>
>> --
>> Claus Ibsen
>> -
>> http://davsclaus.com @davsclaus
>> Camel in Action 2: https://www.manning.com/ibsen2
>>
>
>
>
> --
> --
> David J. M. Karlsen - http://www.linkedin.com/in/davidkarlsen



-- 
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


Re: Getting ready for Apache Camel 2.21 release

2018-02-26 Thread Gregor Zurowski
Hi,

Yes, I am available for cutting the release next week.

Thanks,
Gregor


On Feb 26, 2018 10:10 AM, "Claus Ibsen"  wrote:

Hi

We should start to close down and get ready for the expected Camel 2.21
release.

If you have any new functionality then its last call to get that
implemented and committed.

There are currently 61 tickets [1] assigned to 2.21.0 release which is
too much. I will go over them and you are of course also welcome to
take a look, and move tickets to 2.21.1 or 2.22.0.

I think we need to use this week to get the last tickets resolved,
bugs fixed, stable the CI tests and what else, and then we can touch
base in start of next week to plan for cutting the 2.21 RC builds.
Gregor do you have time for example from next week / next weekend to
cut the RC?


[1] - https://issues.apache.org/jira/issues/?jql=project%20%
3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
20statusCategory%20%3D%20new





--
Claus Ibsen
-
http://davsclaus.com @davsclaus
Camel in Action 2: https://www.manning.com/ibsen2


R: Re: Getting ready for Apache Camel 2.21 release

2018-02-26 Thread Andrea Cosentino
Frankly speaking I don't think we are ready for supporting SB 2. We don't have 
the time if we release by the end of February 
 
  Il lun, 26 feb, 2018 alle 19:18, Pascal Schumacher 
ha scritto:   Am 26.02.2018 um 14:04 schrieb David Karlsen:
> It would be super-nice if camel could do a release supporting spring-boot
> 2.x quite close to boot 2.x releasing!

+1, that would be great.

The planned release date of spring boot 2.0 is tomorrow, so if the camel 
spring boot 2.0 branch is ready it could theoretically be possible to 
support spring boot 2.0 with camel 2.21.
  


Re: Getting ready for Apache Camel 2.21 release

2018-02-26 Thread Pascal Schumacher

Am 26.02.2018 um 14:04 schrieb David Karlsen:

It would be super-nice if camel could do a release supporting spring-boot
2.x quite close to boot 2.x releasing!


+1, that would be great.

The planned release date of spring boot 2.0 is tomorrow, so if the camel 
spring boot 2.0 branch is ready it could theoretically be possible to 
support spring boot 2.0 with camel 2.21.


Re: Getting ready for Apache Camel 2.21 release

2018-02-26 Thread David Karlsen
It would be super-nice if camel could do a release supporting spring-boot
2.x quite close to boot 2.x releasing!

2018-02-26 10:10 GMT+01:00 Claus Ibsen :

> Hi
>
> We should start to close down and get ready for the expected Camel 2.21
> release.
>
> If you have any new functionality then its last call to get that
> implemented and committed.
>
> There are currently 61 tickets [1] assigned to 2.21.0 release which is
> too much. I will go over them and you are of course also welcome to
> take a look, and move tickets to 2.21.1 or 2.22.0.
>
> I think we need to use this week to get the last tickets resolved,
> bugs fixed, stable the CI tests and what else, and then we can touch
> base in start of next week to plan for cutting the 2.21 RC builds.
> Gregor do you have time for example from next week / next weekend to
> cut the RC?
>
>
> [1] - https://issues.apache.org/jira/issues/?jql=project%20%
> 3D%20CAMEL%20AND%20fixVersion%20%3D%202.21.0%20AND%
> 20statusCategory%20%3D%20new
>
>
>
>
>
> --
> Claus Ibsen
> -
> http://davsclaus.com @davsclaus
> Camel in Action 2: https://www.manning.com/ibsen2
>



-- 
--
David J. M. Karlsen - http://www.linkedin.com/in/davidkarlsen