Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-10-01 Thread Petr, OK1RP/M0SIS
Andy

do not glue to date of first post date in the link. Please follow and refer
to its revision date in the end of the document in the link as it keeps
updated as much as possible.

Simply check the revision label on the PA/LPF board of your KPA500 and if
you have rev. D9 or earlier with surface mount board (NO earlier rev. A or B
with thru-hole yellow capacitors board) then the mod is for you if needed. 

As I mentioned it is not neccessary to do it if you hate to open and
dismantling your KPA500 if all is currently working well for you... There is
tons of amps that works like champ even they are old and not modified. So if
you have not issues and do not want to make prevent mod then stay calm.

BTW: yes it is official mod, Elecraft parts kit: E850607

good luck,
Petr, OK1RP



-
73 - Petr, OK1RP 
"Apple & Elecraft freak"
B:http://ok1rp.blogspot.com
MeWe: https://bit.ly/2HGPoDx
MeWe: https://bit.ly/2FmwvDt
--
Sent from: http://elecraft.365791.n2.nabble.com/
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-30 Thread Bill Johnson
Please explain.

73,
Bill
K9YEQ

https://wrj-tech.com/

-Original Message-
From: elecraft-boun...@mailman.qth.net  On 
Behalf Of Wes
Sent: Monday, September 30, 2019 6:58 PM
To: elecraft@mailman.qth.net
Subject: Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E 
guide available

I don't believe that configuration management is Elecraft's strong suit.

On 9/30/2019 4:17 PM, Andy Durbin wrote:
> Elecraft must be enjoying the confusion.
>
> Andy, k3wyc
>

__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html Message 
delivered to k9...@live.com 
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-30 Thread Wes

I don't believe that configuration management is Elecraft's strong suit.

On 9/30/2019 4:17 PM, Andy Durbin wrote:

Elecraft must be enjoying the confusion.

Andy, k3wyc



__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-30 Thread Andy Durbin
"It is this surface mount board that needs its parts changed".

I suspect that should be  - "some early surface mount boards may need their 
parts changed".

As I posted earlier, and show again below, this mod appear to have been 
introduced late 2013.

Elecraft must be enjoying the confusion.  If not, someone would post which 
serial numbers may need to be modified.

Andy, k3wyc


From: Andy Durbin
Sent: Tuesday, September 24, 2019 9:38 AM
To: elecraft@mailman.qth.net 
Subject: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide 
available

The posted link points to a web page dated 7 February 2017.   Was the page 
content changed without changing the date?

I checked my KPA500 schematics and the component values listed in the mod 
instructions all seem to be the same as those shown in "KPA 500 TR Switch" page 
3 of 3, rev D2, dated 12/5/13.   Should I assume that all KPA500 delivered 
after 2013 would have this modification included?

73,
Andy, k3wyc
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-27 Thread Petr, OK1RP/M0SIS
Ben,

according to your information the LPF T_R Switching rework Rev.E, Elecraft
Parts Kit: E850607 has been installed already... "In addition , under
warrantee, the T/R switch was updated ( Rev E?? ), and the 12M mod was
performed."

So your PA/LPF board should be now marked D10 near on the white label.





-
73 - Petr, OK1RP 
"Apple & Elecraft freak"
B:http://ok1rp.blogspot.com
MeWe: https://bit.ly/2HGPoDx
MeWe: https://bit.ly/2FmwvDt
--
Sent from: http://elecraft.365791.n2.nabble.com/
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-25 Thread w4sc
I have serial # 1866.  I am the second owner, and Elecraft paperwork I received 
with the unit shows the unit was returned to Elecraft for “PA DISS Fault on 20M 
and 6M, with D10 and L6 being replace.

In addition , under warrantee, the T/R switch was updated ( Rev E?? ), and the 
12M mod was performed.  There are NO details as to  exactly what was replaced.  
There is no indication as to what the NEW rev level of the LPF would be as a 
result.

The upshot of all this is, if you have an earlier s/n, the above may apply!


73 de Ben W4SC

Sent from Mail for Windows 10

__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 

Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-25 Thread Petr, OK1RP/M0SIS
Buck,

unfortunately I have not info about the s/n relate to revisions of the
PA/LPF boards.
The best way would be to ask Elecraft service for that.
I know that rev. D or earlier revisions could be modified if needed.




-
73 - Petr, OK1RP 
"Apple & Elecraft freak"
B:http://ok1rp.blogspot.com
MeWe: https://bit.ly/2HGPoDx
MeWe: https://bit.ly/2FmwvDt
--
Sent from: http://elecraft.365791.n2.nabble.com/
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com 


Re: [Elecraft] new revision of KPA500 LPF T_R Switching rework Rev.E guide available

2019-09-24 Thread Buck
Do we have a first serial number that is "safe?" I hate to take mine 
apart to see if this is needed.


Buck, k4ia
Honor Roll
8BDXCC
EasyWayHamBooks.com

On 9/24/2019 9:27 AM, Petr, OK1RP/M0SIS wrote:

Hi folks,

just FYI...

Latest updated revision (rev.09-19) of the Elecraft KPA500 - LPF T/R Switch
Rework Rev. E guide is available on my blog here:

http://ok1rp.blogspot.com/2017/02/elecraft-kpa500-lpf-tr-switch-rework.html

Document updates in rev.09-19:

1. All 7 components to be modified or replace in the modification are now
highlighted on the PA/LPF board picture

2. I added short instruction how to remove the PA/LPF module from the KPA500
cabinet (ref. to KPA500 Kit Assembly Instruction manual)

3. Picture of the PA/LPF board with all 7 components marks is available with
better resolution.

The Elecraft KPA500 LPF T_R Switching rework Rev.E guide_24Sep19 document is
also available in .pdf format upon email request.

Maybe it will help,





-
73 - Petr, OK1RP
"Apple & Elecraft freak"
B:http://ok1rp.blogspot.com
MeWe: https://bit.ly/2HGPoDx
MeWe: https://bit.ly/2FmwvDt
--
Sent from: http://elecraft.365791.n2.nabble.com/
__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to radiok...@gmail.com


__
Elecraft mailing list
Home: http://mailman.qth.net/mailman/listinfo/elecraft
Help: http://mailman.qth.net/mmfaq.htm
Post: mailto:Elecraft@mailman.qth.net

This list hosted by: http://www.qsl.net
Please help support this email list: http://www.qsl.net/donate.html
Message delivered to arch...@mail-archive.com