[jira] [Commented] (GEODE-4803) CI: ConcurrentDeployDUnitTest fails intermittently

2018-07-06 Thread ASF subversion and git services (JIRA)


[ 
https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16535437#comment-16535437
 ] 

ASF subversion and git services commented on GEODE-4803:


Commit 2ba81f6e78e49b515e9271695f160b42218988b8 in geode's branch 
refs/heads/feature/GEODE-QueryProvider from jinmeiliao
[ https://gitbox.apache.org/repos/asf?p=geode.git;h=2ba81f6 ]

GEODE-4803: remove flaky category (#2108)

Co-authored-by: Finn Southerland 

> CI: ConcurrentDeployDUnitTest fails intermittently
> --
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
>  Issue Type: Bug
>  Components: gfsh
>Affects Versions: 1.5.0
>Reporter: Kenneth Howe
>Assignee: Jinmei Liao
>Priority: Major
>  Labels: ci, pull-request-available, swat
> Fix For: 1.7.0
>
> Attachments: Test results - Class 
> org.apache.geode.management.internal.cli.commands.ConcurrentDeployDUnitTest.html
>
>  Time Spent: 40m
>  Remaining Estimate: 0h
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy 
> .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for 
> the gfsh clients to finish. Sometimes in the CI pipelines one or more of the 
> clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in 
> machine and network speed.
> Also see GEODE-800.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)


[jira] [Commented] (GEODE-4803) CI: ConcurrentDeployDUnitTest fails intermittently

2018-07-06 Thread ASF subversion and git services (JIRA)


[ 
https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16535143#comment-16535143
 ] 

ASF subversion and git services commented on GEODE-4803:


Commit 2ba81f6e78e49b515e9271695f160b42218988b8 in geode's branch 
refs/heads/develop from jinmeiliao
[ https://gitbox.apache.org/repos/asf?p=geode.git;h=2ba81f6 ]

GEODE-4803: remove flaky category (#2108)

Co-authored-by: Finn Southerland 

> CI: ConcurrentDeployDUnitTest fails intermittently
> --
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
>  Issue Type: Bug
>  Components: gfsh
>Affects Versions: 1.5.0
>Reporter: Kenneth Howe
>Assignee: Jinmei Liao
>Priority: Major
>  Labels: ci, pull-request-available, swat
> Attachments: Test results - Class 
> org.apache.geode.management.internal.cli.commands.ConcurrentDeployDUnitTest.html
>
>  Time Spent: 40m
>  Remaining Estimate: 0h
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy 
> .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for 
> the gfsh clients to finish. Sometimes in the CI pipelines one or more of the 
> clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in 
> machine and network speed.
> Also see GEODE-800.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)


[jira] [Commented] (GEODE-4803) CI: ConcurrentDeployDUnitTest fails intermittently

2018-07-05 Thread Jinmei Liao (JIRA)


[ 
https://issues.apache.org/jira/browse/GEODE-4803?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel=16534189#comment-16534189
 ] 

Jinmei Liao commented on GEODE-4803:


the most recent failure is unrelated to the flakyness of the test. It's a 
legitimate failure after some changes related to the way temperaryFolder is 
created. Helena had later fixed the issue with 2 other commits: 8bab21a and 
f5eab20

 

> CI: ConcurrentDeployDUnitTest fails intermittently
> --
>
> Key: GEODE-4803
> URL: https://issues.apache.org/jira/browse/GEODE-4803
> Project: Geode
>  Issue Type: Bug
>  Components: gfsh
>Affects Versions: 1.5.0
>Reporter: Kenneth Howe
>Assignee: Jinmei Liao
>Priority: Major
>  Labels: ci, swat
> Attachments: Test results - Class 
> org.apache.geode.management.internal.cli.commands.ConcurrentDeployDUnitTest.html
>
>
> The test concurrently runs iterations of gfsh commands to deploy and undeploy 
> .jar's from 3 gfsh clients to the same server, then waits up to 5 minutes for 
> the gfsh clients to finish. Sometimes in the CI pipelines one or more of the 
> clients don't complete their iterations within the 5 minute wait.
> Test timing and/or client iterations needs to be adjusted for variations in 
> machine and network speed.
> Also see GEODE-800.



--
This message was sent by Atlassian JIRA
(v7.6.3#76005)