GSoC Status - Week 4 (VPM-B)

2015-06-22 Thread Jan Darowski
Hi!
Last week I've managed to fix previous problems with crushing pressure
calculation and implemented critical volume algorithm for vpm-b. It
means that now we can generate vpm-b based deco plans. I've spent a
lot of time on finding the way to merge this new method with the
previous algorithm but I think the result is fine.

Now I will focus on testing these deco plans, integrating with
Subsurface (ui part) and cleaning up the code. By the end of the week,
code should be ready for pull request.

-- 
Jan Darowski
___
subsurface mailing list
subsurface@subsurface-divelog.org
http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface


Re: GSoC Status - Week 4 (VPM-B)

2015-06-22 Thread Dirk Hohndel
On Mon, Jun 22, 2015 at 01:28:04PM +0200, Jan Darowski wrote:
 Hi!
 Last week I've managed to fix previous problems with crushing pressure
 calculation and implemented critical volume algorithm for vpm-b. It
 means that now we can generate vpm-b based deco plans. I've spent a
 lot of time on finding the way to merge this new method with the
 previous algorithm but I think the result is fine.
 
 Now I will focus on testing these deco plans, integrating with
 Subsurface (ui part) and cleaning up the code. By the end of the week,
 code should be ready for pull request.

Good. I was going to send out email today that prior to the mid term
evaluation I want to have seen a first pull request from every student.

/D
___
subsurface mailing list
subsurface@subsurface-divelog.org
http://lists.subsurface-divelog.org/cgi-bin/mailman/listinfo/subsurface