Re: [cross-project-issues-dev] Ready for Neon M5?

2016-02-03 Thread Patrick Bänziger
Dear all, Just to confirm, the scout-rap file was removed (by me) on purpose with the switch of the Scout project to the new HTML renderer. Regards, Patrick -- Software Engineer BSI Business Systems Integration AG Täfernweg 1, CH-5405 Baden T +41 56 484 16 43 www.bsi-software.com

[cross-project-issues-dev] Scout participating in Oxygen

2016-07-20 Thread Patrick Bänziger
Hi, Eclipse Scout will participate in the Oxygen SimRel, with an offset of +3. Release Record: https://projects.eclipse.org/projects/technology.scout/releases/7.0.0 Regards, Patrick smime.p7s Description: S/MIME cryptographic signature ___ cross-pro

[cross-project-issues-dev] Is M2E participating in Oxygen?

2016-08-10 Thread Patrick Bänziger
Hi Our contribution for Eclipse Scout (at +3), depends on M2E which was +2 in Neon. I checked and saw that M2E has updated their version number, but has not enabled their contribution in the b3aggrcon File. There was no message yet to the cross-projects-issues list to announce Oxygen participat

[cross-project-issues-dev] Scout may miss Oxygen M1

2016-08-11 Thread Patrick Bänziger
Scout is participating in Oxygen with offset +3, but likely will miss M1. We are depending on M2E which is disabled as it in turn depends on the disabled WebTools Project (see Fred Bricons message). We'll recontribute to the Oxygen Simrel Build as soon as this is resolved. Regards, Patrick

Re: [cross-project-issues-dev] repo.eclipse.org down?

2016-08-22 Thread Patrick Bänziger
It is: https://bugs.eclipse.org/bugs/show_bug.cgi?id=500044 We’ll need to wait for Ottawa to restart the VM. Regards, Patrick From: cross-project-issues-dev-boun...@eclipse.org [mailto:cross-project-issues-dev-boun...@eclipse.org] On Behalf Of Jens Reimann Sent: Montag, 22. August 2016 11:19 To:

Re: [cross-project-issues-dev] "Eclipse Foundation member" tag at GitHub

2016-08-31 Thread Patrick Bänziger
I entered my GitHub handle in my account page at Eclipse (https://dev.eclipse.org/site_login/myaccount.php) and got an invite to join the Eclipse Foundation later that day. So it might be automatic. (Be careful when typing - you can't change it once entered) Regards, Patrick -Original Mes

Re: [cross-project-issues-dev] 4.7.3 Eclipse and Equinox contribution for Simrel (jetty upgrade)

2018-03-02 Thread Patrick Bänziger
Dear all We’re quite sure that our Scout contribution doesn’t have any SDK dependencies on Jetty, yet our aggregation now seems to fail both with the “Aggregator Model Editor” and when re-enabling in Gerrit: https://hudson.eclipse.org/simrel/job/simrel.oxygen.runaggregator.VALIDATE.gerrit/885/co

Re: [cross-project-issues-dev] 4.7.3 Eclipse and Equinox contribution for Simrel (jetty upgrade)

2018-03-02 Thread Patrick Bänziger
: Cross project issues Subject: Re: [cross-project-issues-dev] 4.7.3 Eclipse and Equinox contribution for Simrel (jetty upgrade) On Fri, Mar 2, 2018 at 3:30 PM, Patrick Bänziger mailto:patrick.baenzi...@bsi-software.com>> wrote: Dear all We’re quite sure that our Scout contribution d

Re: [cross-project-issues-dev] Migration from Hudson to Jenkins is complete

2018-03-15 Thread Patrick Bänziger
Thanks Frederic (and everyone who worked on this)! Wow, that is an amazing amount of Jenkins instances. Maybe you could share some of your and the Foundations experience setting up and operating such an enormous fleet of Jenkins? I'm sure not only I and my colleagues, but also many others could p

[cross-project-issues-dev] Updated version of SimRel Requirements / Deadlines for 2018.09 release train?

2018-07-10 Thread Patrick Bänziger
Hi all I've seen the first declarations of projects participating in the 2018.09 release. This prompted me to check for the new deadlines in the wiki, but: · The SimRel Requirements wiki page [1] seems to still adhere to the timeline for the "old" SimRel with 7 Milestones and 4 RCs. ·

[cross-project-issues-dev] Scout participates in 2018-09

2018-07-13 Thread Patrick Bänziger
Hi all Scout will participate in the 2018-09 SimRel with an offset of +3. The version released will be a 8.0.x service / bugfix release [1]. Regards, Patrick Bänziger [1] https://projects.eclipse.org/projects/technology.scout/releases/8.0.0 smime.p7s Description: S/MIME cryptographic

Re: [cross-project-issues-dev] SimRel 2018-09 Milestone 3 (M3) is available

2018-09-03 Thread Patrick Bänziger
A tentative +1 for Scout. Our core functionality works, but we noticed two things during our tests that might affect other packages: 1) We've noticed that the EPP packages are currently shipped with this update site: "The Eclipse Project Updates" -> http://download.eclipse.org/eclipse/update

[cross-project-issues-dev] Participation in Simrel 2018-12

2018-10-03 Thread Patrick Bänziger
Hi all Scout will participate in the SimRel 2018-12 with an offset of +3. The version released will be a service / bugfix release of 8.0.0 [1]. Regards, Patrick Bänziger [1] https://projects.eclipse.org/projects/technology.scout/releases/8.0.0 smime.p7s Description: S/MIME cryptographic

Re: [cross-project-issues-dev] SimRel 2019-03 Release Candidate 1 (RC1) is available

2019-03-08 Thread Patrick Bänziger
Hi Fred Is there a typo in the compositeArtifacts.jar? My P2browser can't resolve the 2019-03 repository now because one of the children can't be found. Unable to read repository at http://download.eclipse.org/releases/2019-03. No repository found at http://download.eclipse.o

Re: [cross-project-issues-dev] Simultaneous Release 2019-06 opt-in

2019-05-08 Thread Patrick Bänziger
Hi Wayne The participant list correctly shows Scout as a participant, but with an incorrect version. In SimRel 2019-06, Scout will deliver a bugfix release from the 9.0.0 branch [1] again. The 10.0.0 version will be part of a later SimRel (probably 2019-12 – I had added a tentative date to ref