Hi there.
Integration with the CORBA stuff would indeed take several weeks; and
then after that we need to grind it through the TCK. So I don't
think we can finish all this before the proposed cut-off 3 weeks from
now.
I've been down with pneumonia for the last 3+ weeks, so things have
On 10/17/05, Kresten Krab Thorup [EMAIL PROTECTED] wrote:
Integration with the CORBA stuff would indeed take several weeks; and
then after that we need to grind it through the TCK. So I don't
think we can finish all this before the proposed cut-off 3 weeks from
now.
I've been down with
Bruce Snyder wrote:
On 10/17/05, Kresten Krab Thorup [EMAIL PROTECTED] wrote:
Integration with the CORBA stuff would indeed take several weeks; and
then after that we need to grind it through the TCK. So I don't
think we can finish all this before the proposed cut-off 3 weeks from
now.
All,
I sent an e-mail out about a week ago on what people thought about getting
Geronimo 1.0 out for Apache Con coming up in December. I've heard back from a
few folks and the feedback has been generally positive. There are a lot of
things we'd like to get done in terms of new feature /
+1 on the timeline.
I'd like to add evaluate all bug reports in detail to the list for
1.0. Of course, there needs to be widespread agreement in order for
that to actually happen. :)
Aaron
On 10/13/05, Matt Hogstrom [EMAIL PROTECTED] wrote:
All,
I sent an e-mail out about a week ago on
+1 and sweet calendar... looks like you are management material ;)
-dain
On Oct 13, 2005, at 10:49 AM, Matt Hogstrom wrote:
All,
I sent an e-mail out about a week ago on what people thought about
getting Geronimo 1.0 out for Apache Con coming up in December.
I've heard back from a few
If you mean I can type with two fingers...sadly, your probably right ;-P
Dain Sundstrom wrote:
+1 and sweet calendar... looks like you are management material ;)
-dain
On Oct 13, 2005, at 10:49 AM, Matt Hogstrom wrote:
All,
I sent an e-mail out about a week ago on what people thought about
On 10/13/05, Matt Hogstrom [EMAIL PROTECTED] wrote:
I sent an e-mail out about a week ago on what people thought about getting
Geronimo 1.0 out for Apache Con coming up in December. I've heard back from a
few folks and the feedback has been generally positive. There are a lot of
things we'd
Trifork has been silent for a few weeks. I think at this point the integration
work would require several weeks but I'm probably not the best person to
estimate the time.
Perhaps the Trifork folks can comment. Anyone ?
Bruce Snyder wrote:
On 10/13/05, Matt Hogstrom [EMAIL PROTECTED]