[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-10 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-10 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v2.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-05 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-05 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v2.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-04 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

Passed twice, trying one more time to make sure.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-04 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v2.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-04 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-04 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v2.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v1.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v1.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v8.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v5.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v6.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: serverLogForParallelTests.txt)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v7.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v4.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_4.x-HBase-1.1_WIP.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: parallelize_4.x-Hbase1.1_wip.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v10.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v1.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v9.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v3.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v2.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v10.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v10.patch, PHOENIX-3181_v2.patch, 
> PHOENIX-3181_v3.patch, PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> PHOENIX-3181_v9.patch, parallelize_4.x-Hbase1.1_wip.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v10.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v10.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v10.patch, PHOENIX-3181_v2.patch, 
> PHOENIX-3181_v3.patch, PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> PHOENIX-3181_v6.patch, PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> PHOENIX-3181_v9.patch, parallelize_4.x-Hbase1.1_wip.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v9.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-10-03 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v9.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v9.patch

Two passed test runs in a row. Let's try one more time.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v9.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v9.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v9.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v9.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: (was: PHOENIX-3181_v9.patch)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-28 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v9.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, PHOENIX-3181_v9.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-23 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v8.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, PHOENIX-3181_v8.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-23 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v7.patch

Trying test run again with less parallelization

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> PHOENIX-3181_v7.patch, parallelize_4.x-Hbase1.1_wip.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-23 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v6.patch

Attaching patch to get test run with parallelization turned on.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, PHOENIX-3181_v6.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-21 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v5.patch

Patch that turns on parallelization in surefire. Let's see what the test run 
looks like.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: James Taylor
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, PHOENIX-3181_v5.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-15 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v4.patch

Thanks, [~rajeshbabu]. Here's the patch you need to apply to master - I've set 
a couple of tests in LocalIndexIT to ignore - I can just move these out to a 
separate class derived from BaseHBaseManagedTimeIT if need be, so it's not 
critical. You just need to run mvn verify a few times after removing the ignore 
tags. At least on my Mac, it pretty consistently hangs.

If you can figure out PHOENIX-3281, you win a prize :-). That's the real 
blocker. Seems like the JVMs aren't exiting as they should.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> PHOENIX-3181_v4.patch, parallelize_4.x-Hbase1.1_wip.patch, 
> serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-13 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: serverLogForParallelTests.txt

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> parallelize_4.x-Hbase1.1_wip.patch, serverLogForParallelTests.txt
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-13 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v3.patch

Take a look at this patch, [~rajeshbabu]. You can apply and run it against 
master. I've removed the @BeforeClass method and the setting of DROP_META_DATA 
of true, since we generate unique tables for every test so this should not be 
necessary.

If I add an @Ignore tag for the split and merge tests (as in this patch), then 
the LocalIndexIT passes consistently with the rest of the tests. But if I don't 
ignore them, HBase gets into some kind of bad state and never goes down (at 
least for 45mins). I'll attach the server log and maybe you can spot something. 
The logs are a mix of all the tests, but you'll see at the tail of the logs how 
HBase is stuck, though.

FYI, the test time goes down from about 40mins to less than 14mins with this 
approach, so the time savings is significant.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, PHOENIX-3181_v3.patch, 
> parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-11 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v2.patch

Tests run against HBase-1.2.0 (i.e. master branch) consistently do not hang, so 
that's good news. I've run them 7x in a row and they finish in 5:44min with the 
following failures:

Failed tests: 
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsert3:314
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsert4:337
  DynamicUpsertIT.testFullUpsert:152 expected:<[a]Value> but was:<[DynCol]Value>
  HashJoinMoreIT.assertNoUnfreedMemory:112 expected:<0> but was:<2811>
  
PhoenixRuntimeIT.testGetTenantIdExpressionForSaltedTable:80->testGetTenantIdExpression:115->assertTenantIds:75
 expected:<[, FMUSKJCAIGFTYUPRARZO]> but was:<[, , , , , , 
FMUSKJCAIGFTYUPRARZO]>
  
PhoenixRuntimeIT.testGetTenantIdExpressionForUnsaltedTable:85->testGetTenantIdExpression:115->assertTenantIds:75
 expected:<[, YYODODSANQYVGUCNSBKF]> but was:<[, , , , , , , 
FMUSKJCAIGFTYUPRARZO, YYODODSANQYVGUCNSBKF]>
  RegexpSplitFunctionIT.testSplit_AlternateSeparator:144 array lengths 
differed, expected.length=3 actual.length=1
  RegexpSplitFunctionIT.testSplit_NoSplitString:170 array lengths differed, 
expected.length=1 actual.length=3
  RegexpSplitFunctionIT.testSplit_NullDynamicSeparator:231 expected null, but 
was:<['ONE', 'TWO', 'THREE']>
  RegexpSplitFunctionIT.testSplit_NullString:207 expected null, but 
was:<['ONE', 'TWO', 'THREE']>
  RegexpSplitFunctionIT.testSplit_PatternBasedSplit:183 array lengths differed, 
expected.length=4 actual.length=1
  RegexpSplitFunctionIT.testSplit_PatternEscape:196 array lengths differed, 
expected.length=3 actual.length=1
  StoreNullsIT.testQueryingHistory:154
  PhoenixTraceReaderIT.testMultipleSpans:122->validateTraces:132 Got an 
unexpected traceid expected:<12345> but was:<987654>
  TransactionIT.testTxnClosedCorrecty:152 There should be no invalid 
transactions
Tests in error: 
  AlterSessionIT.testUpdateConsistency:65 » SQL ERROR 1101 (XCL01): ResultSet 
is...
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsert1:263 » 
ConcurrentModification
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsert2:286 » 
ConcurrentModification
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsertSelect1:370 » 
PhoenixIO
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsertSelect2:394 » 
NullPointer
  ArrayToStringFunctionIT.testArrayToStringFunctionWithUpsertSelect3:443 » 
PhoenixIO
  
QueryMoreIT.testQueryMore1:53->testQueryMore:113->upsertSelectRecordsInCursorTableForTenant:207
 » SequenceAlreadyExists
  
QueryMoreIT.testQueryMore2:59->testQueryMore:113->upsertSelectRecordsInCursorTableForTenant:207
 » SequenceAlreadyExists
  StoreNullsIT.testDeletes:171 » ArrayIndexOutOfBounds 1
  StoreNullsIT.testStoringNulls:101 » ConcurrentModification
  ViewIndexIT.testDeleteViewIndexSequences:127->createBaseTable:84 » PhoenixIO 
o...

Tests run: 1018, Failures: 15, Errors: 11, Skipped: 5


> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, PHOENIX-3181_v2.patch, 
> parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-10 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Attachment: PHOENIX-3181_v1.patch

Attaching patch that takes about 6mins to run. Every third time or so, the test 
run hangs. I've tried the following, but haven't found a solution yet:
- using Java 8 instead of Java 7
- not running LocalIndexIT (which does a lot of splitting)
- not running any transactional test (to rule out transaction manager)

None of these seemed to make a difference.

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> PHOENIX-3181_v1.patch, parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-09 Thread prakul agarwal (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

prakul agarwal updated PHOENIX-3181:

Attachment: PHOENIX-3181_4.x-HBase-1.1_WIP.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: PHOENIX-3181_4.x-HBase-1.1_WIP.patch, 
> parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-06 Thread prakul agarwal (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

prakul agarwal updated PHOENIX-3181:

Attachment: parallelize_4.x-Hbase1.1_wip.patch

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-06 Thread prakul agarwal (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

prakul agarwal updated PHOENIX-3181:

Attachment: (was: parallelize.diff)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: parallelize_4.x-Hbase1.1_wip.patch
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-09-06 Thread prakul agarwal (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

prakul agarwal updated PHOENIX-3181:

Attachment: parallelize.diff

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>Assignee: prakul agarwal
> Attachments: parallelize.diff
>
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)


[jira] [Updated] (PHOENIX-3181) Run test methods in parallel to reduce test suite run time

2016-08-16 Thread James Taylor (JIRA)

 [ 
https://issues.apache.org/jira/browse/PHOENIX-3181?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel
 ]

James Taylor updated PHOENIX-3181:
--
Description: With PHOENIX-3036, the tests within a test class can be 
executed in parallel since the table names won't conflict. This should greatly 
reduce the time taken to run all of our tests.  (was: With PHOENIX-2995, the 
tests within a test class can be executed in parallel since the table names 
won't conflict. This should greatly reduce the time taken to run all of our 
tests.)

> Run test methods in parallel to reduce test suite run time
> --
>
> Key: PHOENIX-3181
> URL: https://issues.apache.org/jira/browse/PHOENIX-3181
> Project: Phoenix
>  Issue Type: Bug
>Reporter: James Taylor
>
> With PHOENIX-3036, the tests within a test class can be executed in parallel 
> since the table names won't conflict. This should greatly reduce the time 
> taken to run all of our tests.



--
This message was sent by Atlassian JIRA
(v6.3.4#6332)