I experience this as well, only on 80 meters with the KPA500 in
operate. Always thought that it was RF getting into the KAT500 sensing
as I can usually back off to 300 Watts, force a KAT500 re-tune and continue.
Glenn - KD0Q
On 12/30/2013 07:59, Bill W2BLC wrote:
This is exactly why I want
Everything in the shack is grounded to an aluminum bus bar across the
back of the operating table which is tied with #6 solid copper to the
same point as the tower and AC Main grounds.
Just for reference, the antenna is a 260ft OCF Inverted Vee at 75 ft
using a Balun Designs #4115ocf
unless
special bonding is used to slow (but not stop) the oxidation.
Just something to bear in mind.
73,
Don W3FPR
On 12/30/2013 3:23 PM, KD0Q-Glenn wrote:
Everything in the shack is grounded to an aluminum bus bar across the
back of the operating table which is tied with #6 solid copper
I ordered on the phone May 18th. and told that a confirmation would be sent
after the shipping costs were known.
73, Glenn - KD0Q
- Original Message -
From: Bob k...@att.net
Cc: elecraft@mailman.qth.net
Sent: Friday, June 01, 2012 6:04 PM
Subject: Re: [Elecraft] Office
On a
Hi Joel,
W1AW code pratice transmissions might be an idea. They are on a number of
frequencies, times and days. Details are at
http://www.arrl.org/w1aw-operating-schedule.
73 Good Luck!
Glenn/KD0Q
- Original Message -
From: Joel Black joel.b.bl...@gmail.com
To:
Hi Larry,
Propagation software might give you some ideas about bands and times. Check
out VOAProp at http://www.g4ilo.com/voaprop.html
73, Glenn/KD0Q
- Original Message -
From: Larry effectiveh...@bellsouth.net
To: elecraft@mailman.qth.net
Sent: Thursday, February 02, 2012 7:43 AM
The CQ 160M CW contest last weekend was the first contest for my K3 SN 4518.
First time I've heard the fans kick in, same for the Samlex PS. And I have to
say I am very pleased with the receive performance - with filter bandwidth set
to 200 HZ and fine tuning, the band didn't seem crowded at
Hello Elecrafters,
K3 #4518 arrived via UPS last Tuesday afternoon and made the first contact last
night. The inventory and build took me about 11 hours over the course of 4
days with lots of stopping and starting. All the checks and calibrations went
smoothly.
The excellent documentation
8 matches
Mail list logo