Carl,
Time to quiz Elecraft support on that. I have very little experience
with the internal transverters.
73,
Don W3FPR
On 9/23/2015 4:55 PM, Carl Jón Denbow wrote:
Well, Don, I finally got both modules installed. Boy do I hate
working with TMP connectors in close quarters, especially
Well, Don, I finally got both modules installed. Boy do I hate working
with TMP connectors in close quarters, especially the flimsily mounted
females on boards such as the K3RXA. But that's another story. Right
now, I seem to have a problem with the K144XV. I've installed it
according to
OK, Don, I've run into a little confusion: the bottom of page 11 of the
K144XV instructions has details about installing a new back panel with
an ANT 3 hole. However, I don't have a replacement panel and my K3s back
panel already has an ANT 3 hole. A few pages earlier the instructions
have a
Carl,
I think I understand why you are confused. Yes, since you already have
the rear panel with the ANT3 hole, resume about the middle of page 12
where it begins with "Locate the TMP cable ..."
In order to tighten the BNC connector, you may find it easier to loosen
the panel and tilt it
Carl,
The KRX3 must go in first. If you think about it, the K144XV fits above
the KRX3, so if you install the K144XV first, you will not be able to
get the KRX3 in place below it.
The K144XV instructions page 11 3rd checkbox tells you when to install
the KRX3 *if* you had removed it. This
I seem to have a dilemma. I'm getting ready to install both the K144XV
and the KRX3A in my new K3s. The respective instructions each say to
remove the other first. I've read through both manuals, and I'm still
confused on the best order to do these two operations. I put my KRX3A
together
6 matches
Mail list logo