Re: [Elecraft] KAT100 General Failure

2020-01-04 Thread Don Wilhelm
Jonathan, That is a great discovery. Yes, if U5 was getting hot it would be dragging down the 5 volt supply and causing U1 to not function. 73, Don W3FPR On 1/4/2020 12:18 PM, Jonathan Taylor, K1RFD wrote: Don, Z1 is resonating away, but in the course of verifying that, I noticed that the

Re: [Elecraft] KAT100 General Failure

2020-01-04 Thread Jonathan Taylor, K1RFD
Don, Z1 is resonating away, but in the course of verifying that, I noticed that the U5 op-amp was getting hot to the touch. I replaced it, and now all is working normally. Perhaps it was loading down the 5V supply excessively. I'm guessing that U5 made the ultimate sacrifice in the same

Re: [Elecraft] KAT100 General Failure

2020-01-04 Thread Don Wilhelm
Jonathan, Yes, replacing KAT100 U1 would be the prudent first step.  But if you can, first determine if the resonator Z1 is providing clock pulses to U1 pins 13 and 14.  Without those clock pulses, U1 will not be functional. If you have a local ham who also has a KAT100, see if you can swap

Re: [Elecraft] KAT100 General Failure

2020-01-04 Thread Jonathan Taylor, K1RFD
Thanks Don. I had the same thought about U1, but unfortunately the symptoms remain after re-seating it a couple of times. Regarding AUXBUS, I believe continuity is good, since a logic probe on the KAT100 side shows activity when certain K2 controls are manipulated such as Power, Tune, and Band.

Re: [Elecraft] KAT100 General Failure

2020-01-04 Thread Don Wilhelm
Johnathan, Since the KAT100 is not recognized in the K2 menu, you either have a problem with the KAT100 firmware, but do check the cable for continuity of the AUXBUS signal that is used to communicate among the various pieces of firmware ICs throughout the K2 system. Since the KAT100 has

[Elecraft] KAT100 General Failure

2020-01-03 Thread Jonathan Taylor, K1RFD
I am testing my KAT100, which had been sitting idle for a number of years. It is connected to the K2/100 via the DB9 cable as described in the KAT100 manual. The two are interconnected with a coax cable and Ant1 is connected to a dummy load. 1. Apply power to KAT100. 2. Turn on K2/100. 3.