Re: Automating weight and/or CP changes

2013-10-05 Thread Martin Packer
: Automating weight and/or CP changes Sent by:IBM Mainframe Discussion List IBM-MAIN@listserv.ua.edu So if we have 4 CPs and I want to turn one off on a particular LPAR, I would be able to do this with CPM by issuing a command? or If I want to change the weights because we have different

Re: Automating weight and/or CP changes

2013-10-04 Thread R.S.
W dniu 2013-10-04 03:16, Ted MacNEIL pisze: WLM can already do both weight and CPU changes. Been at it for 10 years. For non-sysplexed systems? -- Radoslaw Skorupka Lodz, Poland -- Treść tej wiadomości może zawierać informacje prawnie chronione Banku przeznaczone wyłącznie do użytku

Re: Automating weight and/or CP changes

2013-10-04 Thread gsg
So if we have 4 CPs and I want to turn one off on a particular LPAR, I would be able to do this with CPM by issuing a command? or If I want to change the weights because we have different settings from night/day. I can do this with CPM and either my autoops package or job scheduler?

Automating weight and/or CP changes

2013-10-03 Thread gsg
Does anyone know if it is possible to automate weight and/or CP changes. ex. During the day we want 3 CP on LPARA and at night we want 4 CPs or we want LPARA to have 60 weight, LPARB to 30 and LPARC to 20, but at night we want LPARA to have 80 and LPARB to have 10. Something along those

Re: Automating weight and/or CP changes

2013-10-03 Thread Ted MacNEIL
@LISTSERV.UA.EDU Reply-To: IBM Mainframe Discussion List IBM-MAIN@LISTSERV.UA.EDU Subject: Automating weight and/or CP changes Does anyone know if it is possible to automate weight and/or CP changes. ex. During the day we want 3 CP on LPARA and at night we want 4 CPs or we want LPARA to have 60

Re: Automating weight and/or CP changes

2013-10-03 Thread Roger Lowe
We use a combination of z/OS Capacity Provisioning Manager (CPM) and the Schedule Operations task on the HMC on a fortnightly basis to do this. We use our automation product (CONTROL-O) to issue a command to CPM to increase one of our CPCs to its high capacity marker and then have the scheduled

Re: Automating weight and/or CP changes

2013-10-03 Thread Ted MacNEIL
2013 20:14:33 To: IBM-MAIN@LISTSERV.UA.EDU Reply-To: IBM Mainframe Discussion List IBM-MAIN@LISTSERV.UA.EDU Subject: Re: Automating weight and/or CP changes We use a combination of z/OS Capacity Provisioning Manager (CPM) and the Schedule Operations task on the HMC on a fortnightly basis to do