[JIRA] (OVIRT-627) Implement Zuul as pre-merge action to run experimental flows
[ https://ovirt-jira.atlassian.net/browse/OVIRT-627?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] eyal edri [Administrator] reassigned OVIRT-627: --- Assignee: bkorren (was: infra) I guess this is the second step after we see Zuul integration works. I think the 1st thing we should do is create some sort of design diagram of how we want the flow to work and what input/output/triggers it should have. > Implement Zuul as pre-merge action to run experimental flows > - > > Key: OVIRT-627 > URL: https://ovirt-jira.atlassian.net/browse/OVIRT-627 > Project: oVirt - virtualization made easy > Issue Type: Bug >Reporter: eyal edri [Administrator] >Assignee: bkorren > > Today, we can test a patch per project on each of the ovirt versions using > experimanal flow > i,e: > run build_artifacts with a patch -> deploy to experimental -> run test job > this is problematic since it actually deploys the build with the patch to the > experimental repo which should only contain built pkg that are merged. > We need to either close the flow or add param to the build artifacts that > says 'create temp repo/test repo' so the built rpm won't be part of the > official tested repo and the link to latest_tested won't be updated if this > option is triggered. -- This message was sent by Atlassian JIRA (v1000.606.0#100023) ___ Infra mailing list Infra@ovirt.org http://lists.ovirt.org/mailman/listinfo/infra
[JIRA] (OVIRT-627) Implement Zuul as pre-merge action to run experimental flows
[ https://ovirt-jira.atlassian.net/browse/OVIRT-627?page=com.atlassian.jira.plugin.system.issuetabpanels:comment-tabpanel&focusedCommentId=20809#comment-20809 ] eyal edri [Administrator] commented on OVIRT-627: - Actually replacing the existing flows which run post merge, we need to check if its possible to run pre-merge with Zuul the entire flow and reject patches if it fails. > Implement Zuul as pre-merge action to run experimental flows > - > > Key: OVIRT-627 > URL: https://ovirt-jira.atlassian.net/browse/OVIRT-627 > Project: oVirt - virtualization made easy > Issue Type: Bug >Reporter: eyal edri [Administrator] >Assignee: infra > > Today, we can test a patch per project on each of the ovirt versions using > experimanal flow > i,e: > run build_artifacts with a patch -> deploy to experimental -> run test job > this is problematic since it actually deploys the build with the patch to the > experimental repo which should only contain built pkg that are merged. > We need to either close the flow or add param to the build artifacts that > says 'create temp repo/test repo' so the built rpm won't be part of the > official tested repo and the link to latest_tested won't be updated if this > option is triggered. -- This message was sent by Atlassian JIRA (v1000.319.1#100012) ___ Infra mailing list Infra@ovirt.org http://lists.ovirt.org/mailman/listinfo/infra
[JIRA] (OVIRT-627) Implement Zuul as pre-merge action to run experimental flows
[ https://ovirt-jira.atlassian.net/browse/OVIRT-627?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] eyal edri [Administrator] updated OVIRT-627: Summary: Implement Zuul as pre-merge action to run experimental flows (was: add per patch testing flow to experimental to ovirt-engine) > Implement Zuul as pre-merge action to run experimental flows > - > > Key: OVIRT-627 > URL: https://ovirt-jira.atlassian.net/browse/OVIRT-627 > Project: oVirt - virtualization made easy > Issue Type: Bug >Reporter: eyal edri [Administrator] >Assignee: infra > > Today, we can test a patch per project on each of the ovirt versions using > experimanal flow > i,e: > run build_artifacts with a patch -> deploy to experimental -> run test job > this is problematic since it actually deploys the build with the patch to the > experimental repo which should only contain built pkg that are merged. > We need to either close the flow or add param to the build artifacts that > says 'create temp repo/test repo' so the built rpm won't be part of the > official tested repo and the link to latest_tested won't be updated if this > option is triggered. -- This message was sent by Atlassian JIRA (v1000.319.1#100012) ___ Infra mailing list Infra@ovirt.org http://lists.ovirt.org/mailman/listinfo/infra