[jira] [Updated] (FLINK-13250) Blink Planner should assign concrete resources to all nodes
[ https://issues.apache.org/jira/browse/FLINK-13250?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Flink Jira Bot updated FLINK-13250: --- Labels: stale-assigned (was: ) > Blink Planner should assign concrete resources to all nodes > --- > > Key: FLINK-13250 > URL: https://issues.apache.org/jira/browse/FLINK-13250 > Project: Flink > Issue Type: Bug > Components: Table SQL / Planner >Reporter: Stephan Ewen >Assignee: Stephan Ewen >Priority: Major > Labels: stale-assigned > > Currently some nodes retain a resource spec of "DEFAULT"/ "UNKNOWN" as the > result of merging the pre-existing "DEFAULT" with the actual profile. -- This message was sent by Atlassian Jira (v8.3.4#803005)
[jira] [Updated] (FLINK-13250) Blink Planner should assign concrete resources to all nodes
[ https://issues.apache.org/jira/browse/FLINK-13250?page=com.atlassian.jira.plugin.system.issuetabpanels:all-tabpanel ] Tzu-Li (Gordon) Tai updated FLINK-13250: Fix Version/s: (was: 1.9.0) > Blink Planner should assign concrete resources to all nodes > --- > > Key: FLINK-13250 > URL: https://issues.apache.org/jira/browse/FLINK-13250 > Project: Flink > Issue Type: Bug > Components: Table SQL / Planner >Reporter: Stephan Ewen >Assignee: Stephan Ewen >Priority: Major > > Currently some nodes retain a resource spec of "DEFAULT"/ "UNKNOWN" as the > result of merging the pre-existing "DEFAULT" with the actual profile. -- This message was sent by Atlassian JIRA (v7.6.14#76016)