Re: [MBZ] Clean 300TD on BAT

2019-10-31 Thread Curley McLain via Mercedes
And for $500 a month, pretty much for the rest of your life,  all you 
get is a succession of electronic toys that may or may not last as long 
as the payments.    The Smoke WILL come out.  The only question is WHEN?


Dwight Giles via Mercedes wrote on 10/31/19 9:35 PM:

Yes. Say on.

Dwight Giles Jr.
Wickford RI




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] Clean 300TD on BAT

2019-10-31 Thread Rick Knoble via Mercedes
 >I am not driving them and waiting for something to fail. If you want new car 
 >type performance, a lot of stuff has to be made new.

Yep. The average new car payment is over $500 a month. That will buy a LOT of 
parts (and labor, if needed).

Rick
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] Clean 300TD on BAT

2019-10-31 Thread Dwight Giles via Mercedes
Yes. Say on.

Dwight Giles Jr.
Wickford RI

On Thu, Oct 31, 2019, 10:34 PM Rick Knoble via Mercedes <
mercedes@okiebenz.com> wrote:

>  >I am not driving them and waiting for something to fail. If you want new
> car type performance, a lot of stuff has to be made new.
>
> Yep. The average new car payment is over $500 a month. That will buy a LOT
> of parts (and labor, if needed).
>
> Rick
> ___
> http://www.okiebenz.com
>
> To search list archives http://www.okiebenz.com/archive/
>
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>
>
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT Post-tension bridge failure in Genoa - Concrete Slab Construction

2019-10-31 Thread Curley McLain via Mercedes
I'm guessing I did cross it in 1968.   I recently sar a program about it 
on WPTV.   THe cables rusted in the conduits. Snap, snap, etc. then BoooM!


Max Dillon via Mercedes wrote on 10/31/19 6:57 PM:

No, I have not studied that one. Haven't spent much time in Northern Italy. I 
have enjoyed driving their Superstrada and Autostrada roads, but I don't think 
I ever crossed that bridge.

Max Dillon
Charleston SC




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] Clean 300TD on BAT

2019-10-31 Thread Karl Wittnebel via Mercedes
I just put a rebuilt 500e subframe into the 87 wagon. Everything OE except
the toe links, which are nla. New half shafts from cvj reman are over $400 plus
shipping. Parts for the links and new control arms are way over 600. New
fasteners, axle nuts, subframe mounts, lower ball joints for the carrier,
plus a $120 tool to press them in and out, a subframe mount tool, and a
diff mount bushing removal set. New socket for axle nuts. New female torx
socket set for the diff flange bolts. New diff mount bolts and lock nuts.
New sportline springs and spring pads are hundreds of dollars. Swaybar
links. The original sls shocks were done - bad ball joints at the bottom
and leaking; they were about 1300 for the parts alone. I had previously put
rebuilt aluminum brembo 500e front and 300mm 600sl rear vented calipers,
rotors, brake lines and r4 pads on, which was must have been $1000 in the
end without labor, including new master cyl, brake fluid, brake bleeder,
dual diaphragm booster, etc. No more than the rebuilt OE stuff, actually,
in terms of price.
I even got OE diff mounts from overseas as they are backordered for the v8
cars. Rear wheel bearings had already been done thankfully, so I didnt have
to buy that tool or tackle the job, but I would have if they had not been
done. Necessary? For peace of mind, yes. What is that worth?

OE door seals for the car are over a grand alone.

Multifunction stalk switch. Ignition tumbler. Over 100 each oe, excluding
labor.

New headlights (old plastic housing tabs had broken off), magnetti marelli,
euro style, 450.  No labor included.

New dash was $250 and a lot of labor, with all the hvac pods at hundreds of
dollars, new climate control unit, evap, compressor, dryer, hoses.

Swapped a black leather interior in; 800 for the donor 95 wagon. Imagine
paying that labor in DC or any other major city.

You can argue that none of it needed to be done, but when the subframe
starts banging on the underside of the car taking off from stoplights, and
the ball joints on the shocks are creaking, it is time. And after pulling
the subframe out, there is no way I am putting it back with any old stuff
on it. I am not driving a car with a cracked dash, creaky suspension or a
subframe that provides automatic 4 wheel steering. The ignition tumbler has
to work well, the brakes have to be brakey, and it should steer like new.

This doesnt include the 500sl junkyard diff and side bearings and seals,
plus labor. I swapped a wavetrac lsd carrier in, which was over a grand for
the part. I was quoted 2700 for that job alone from Leistung. That's why it
happened on my bench. My old diff was spewing metal fragments into the
fluid and had far too much play. It was also 185mm rather than 210.

Anyway for the 123 mentioned, the axle shafts, rebuilt steering box, and
nla sls struts weren't mentioned. And the tranny sounded kind of hinky.

I am at a point where I sort of want things maintained like a certified
aircraft. I am not driving them and waiting for something to fail. If you
want new car type performance, a lot of stuff has to be made new. For the
daily drivers, I pay someone to do it. For the hobby cars I tackle it as
time allows.



On Wed, Oct 30, 2019, 6:21 PM Curley McLain via Mercedes <
mercedes@okiebenz.com> wrote:

> Having done the 124 300D rear subframe piecemeal, several times, I have
> to agree with Jaime.  I did the rear of the 81 240D all at once.  That
> is a FAR superior way to do it.   In the end, the last 2 times I did the
> rear of 124s, I did it all at once.   I won't do piecemeal anymore,
> unless it is a short term emergency.
>
> Andrew Strasfogel via Mercedes wrote on 10/30/19 3:13 PM:
> > Sure.  If I had won the auction I would probably drive it and repair
> issues
> > on a piecemeal basis, as symptoms are observed.
> >
> >
>
>
> ___
> http://www.okiebenz.com
>
> To search list archives http://www.okiebenz.com/archive/
>
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>
>
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT Post-tension bridge failure in Genoa - Concrete Slab Construction

2019-10-31 Thread Dan Penoff via Mercedes
There was a NOVA episode about the Italian bridge collapse a couple of weeks 
ago. Classic “Wow! We never thought *that* could happen!”

-D


> On Oct 31, 2019, at 7:57 PM, Max Dillon via Mercedes  
> wrote:
> 
> 
> No, I have not studied that one. Haven't spent much time in Northern Italy. I 
> have enjoyed driving their Superstrada and Autostrada roads, but I don't 
> think I ever crossed that bridge.
> 
> Max Dillon
> Charleston SC
> 
> Thu Oct 31 16:59:01 EDT 2019 Curley McLain via Mercedes 
> :
> 
>> At least 35 killed in this one:
>> 
>> https://www.theguardian.com/cities/2019/feb/26/what-caused-the-genoa-morandi-bridge-collapse-and-the-end-of-an-italian-national-myth
>> 
>> Max probably knows about it.
>> 
>> Randy Bennell via Mercedes wrote on 10/31/19 3:51 PM:
>> 
>>> https://www.youtube.com/watch?v=hBjntrebxj8
>>> 
>>> An explanation of the design and failure.
>>> 
>>> Randy
>>> 
>>> 
>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 
> 


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT Post-tension bridge failure in Genoa - Concrete Slab Construction

2019-10-31 Thread Max Dillon via Mercedes


No, I have not studied that one. Haven't spent much time in Northern Italy. I 
have enjoyed driving their Superstrada and Autostrada roads, but I don't think 
I ever crossed that bridge.

Max Dillon
Charleston SC

Thu Oct 31 16:59:01 EDT 2019 Curley McLain via Mercedes :
 
> At least 35 killed in this one:
> 
> https://www.theguardian.com/cities/2019/feb/26/what-caused-the-genoa-morandi-bridge-collapse-and-the-end-of-an-italian-national-myth
> 
> Max probably knows about it.
> 
> Randy Bennell via Mercedes wrote on 10/31/19 3:51 PM:
> 
>> https://www.youtube.com/watch?v=hBjntrebxj8
>> 
>> An explanation of the design and failure.
>> 
>> Randy
>> 
>> 
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Peter Frederick via Mercedes
Channels for post-tensioning cast slabs.


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Mitch Haley via Mercedes
Oops, they're having trouble taking the top off the crane.
While they're working on that, we'll go ahead and take the pins out of the 
middle of the crane to save time...
https://www.youtube.com/watch?v=te547Ek0yJo
https://www.youtube.com/watch?v=2AilIZ6FR8w

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Mitch Haley via Mercedes


> On October 31, 2019 at 4:51 PM Randy Bennell via Mercedes 
>  wrote:
> 
> 
> https://www.youtube.com/watch?v=hBjntrebxj8
> 
> An explanation of the design and failure.

A different sort of failure:
https://www.youtube.com/watch?v=eLS-gPu656M

Analysis:
https://www.youtube.com/watch?v=LJevke4_i5Y

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



[MBZ] also interesting

2019-10-31 Thread Randy Bennell via Mercedes

the collapse of the bridge in Minneapolis a few years back.

https://www.youtube.com/watch?v=5L6fsel9hwg

Randy


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



[MBZ] OT Post-tension bridge failure in Genoa - Concrete Slab Construction

2019-10-31 Thread Curley McLain via Mercedes

At least 35 killed in this one:

https://www.theguardian.com/cities/2019/feb/26/what-caused-the-genoa-morandi-bridge-collapse-and-the-end-of-an-italian-national-myth

Max probably knows about it.

Randy Bennell via Mercedes wrote on 10/31/19 3:51 PM:

https://www.youtube.com/watch?v=hBjntrebxj8

An explanation of the design and failure.

Randy



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Curley McLain via Mercedes

"We the incompetent, led by the blind..."
Plenty of blame to slather around.

Randy Bennell via Mercedes wrote on 10/31/19 3:47 PM:

Design failure mostly.


"An examination carried out by theFederal Highway Administration 
discovered 
faults in the design of the bridge, which overestimated the strength 
of the bridge in the region which failed, and underestimated the load 
it would be expected to carry.^[4] 
 
TheNational Transportation Safety Board 
issued 
a "News Release"^[5] 
 
which said,"that load and capacity calculation errors made by FIGG 
Bridge Engineers, Inc., are the probable cause of the fatal ... bridge 
collapse in Miami ..." The same day the NTSB released a 
"synopsis"^[note 1] 
 
of its final report, which stated


   ... that the probable cause of the Florida International University
   (FIU) pedestrian bridge collapse was the load and capacity
   calculation errors made by FIGG Bridge Engineers, Inc., (FIGG) in
   its design of the main span truss member 11/12 nodal region and
   connection to the bridge deck. Contributing to the collapse was the
   inadequate peer review performed by Louis Berger, which failed to
   detect the calculation errors in the bridge design. Further
   contributing to the collapse was the failure of the FIGG engineer of
   record to identify the significance of the structural cracking
   observed in this node before the collapse and to obtain an
   independent peer review of the remedial plan to address the
   cracking. Contributing to the severity of the collapse outcome was
   the failure of MCM; FIGG; Bolton, Perez and Associates Consulting
   Engineers; FIU; and the Florida Department of Transportation to
   cease bridge work when the structure cracking reached unacceptable
   levels and to take appropriate action to close SW 8th Street as
   necessary to protect public safety.^[6]
 




/The New York Times 
/concluded that "the 
chief probable cause" was "the design by FIGG Bridge Engineers", but 
that "every company, institution and agency involved in the project 
was partly to blame for the bridge collapse"



"As the post-tensioning operation by the VSL company was being carried 
out on bridge diagonal member support #11, the bottom joint (which 
contains the anchor nut for the post-tensioning rod) apparently failed 
explosively, causing the bridge to collapse. Currently, it remains 
unknown why the joint may have failed, although post-tensioning 
remains a likely contributor.^"






___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Randy Bennell via Mercedes

https://www.youtube.com/watch?v=hBjntrebxj8

An explanation of the design and failure.

Randy

On 31/10/2019 3:42 PM, G Mann via Mercedes wrote:

I believe I recall the postmortem on the event found a combination of lack
of spec post tension and failure to allow proper cure time for the
concrete.
Do not recall for sure, but my memory says, concrete was also sub spec for
strength in the mix.
Rush job, with failure on film as I recall..

On Thu, Oct 31, 2019 at 1:29 PM MG via Mercedes 
wrote:


I believe it was incorrect tension.

OK Don via Mercedes wrote:

The presence, or lack of them caused the collapse?

On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
mercedes@okiebenz.com> wrote:


Post tensioning cables.

-D

Is that not what caused the problem with that pedestrian bridge to some
university down your way, that collapsed?

Randy




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Allan Streib via Mercedes
It collapsed during a post-tensioning operation, but the cause was an
error by the engineering firm that designed it.


MG via Mercedes  writes:

> I believe it was incorrect tension.
>
> OK Don via Mercedes wrote:
>> The presence, or lack of them caused the collapse?
>> 
>> On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
>> mercedes@okiebenz.com> wrote:
>> 
 Post tensioning cables.

 -D
>>> Is that not what caused the problem with that pedestrian bridge to some
>>> university down your way, that collapsed?
>>>
>>> Randy
>>>
>> 
>> 
>
> ___
> http://www.okiebenz.com
>
> To search list archives http://www.okiebenz.com/archive/
>
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Randy Bennell via Mercedes

Design failure mostly.


"An examination carried out by theFederal Highway Administration 
discovered 
faults in the design of the bridge, which overestimated the strength of 
the bridge in the region which failed, and underestimated the load it 
would be expected to carry.^[4] 
 
TheNational Transportation Safety Board 
issued 
a "News Release"^[5] 
 
which said,"that load and capacity calculation errors made by FIGG 
Bridge Engineers, Inc., are the probable cause of the fatal ... bridge 
collapse in Miami ..." The same day the NTSB released a "synopsis"^[note 
1] 
 
of its final report, which stated


   ... that the probable cause of the Florida International University
   (FIU) pedestrian bridge collapse was the load and capacity
   calculation errors made by FIGG Bridge Engineers, Inc., (FIGG) in
   its design of the main span truss member 11/12 nodal region and
   connection to the bridge deck. Contributing to the collapse was the
   inadequate peer review performed by Louis Berger, which failed to
   detect the calculation errors in the bridge design. Further
   contributing to the collapse was the failure of the FIGG engineer of
   record to identify the significance of the structural cracking
   observed in this node before the collapse and to obtain an
   independent peer review of the remedial plan to address the
   cracking. Contributing to the severity of the collapse outcome was
   the failure of MCM; FIGG; Bolton, Perez and Associates Consulting
   Engineers; FIU; and the Florida Department of Transportation to
   cease bridge work when the structure cracking reached unacceptable
   levels and to take appropriate action to close SW 8th Street as
   necessary to protect public safety.^[6]
   



/The New York Times 
/concluded that "the 
chief probable cause" was "the design by FIGG Bridge Engineers", but 
that "every company, institution and agency involved in the project was 
partly to blame for the bridge collapse"



"As the post-tensioning operation by the VSL company was being carried 
out on bridge diagonal member support #11, the bottom joint (which 
contains the anchor nut for the post-tensioning rod) apparently failed 
explosively, causing the bridge to collapse. Currently, it remains 
unknown why the joint may have failed, although post-tensioning remains 
a likely contributor.^"





On 31/10/2019 3:42 PM, G Mann via Mercedes wrote:

I believe I recall the postmortem on the event found a combination of lack
of spec post tension and failure to allow proper cure time for the
concrete.
Do not recall for sure, but my memory says, concrete was also sub spec for
strength in the mix.
Rush job, with failure on film as I recall..

On Thu, Oct 31, 2019 at 1:29 PM MG via Mercedes 
wrote:


I believe it was incorrect tension.

OK Don via Mercedes wrote:

The presence, or lack of them caused the collapse?

On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
mercedes@okiebenz.com> wrote:


Post tensioning cables.

-D

Is that not what caused the problem with that pedestrian bridge to some
university down your way, that collapsed?

Randy




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



[MBZ] OT: Special - Capacitors - Run and Start, Round and Oval

2019-10-31 Thread Curley McLain via Mercedes

Usual disclaimers, etc.

In case any of you need start or run capacitors, see the l inks below.

I've found them to have some good prices for electric motors also. 
(Single phase, and 3 phase)


*
You don't want to miss this.
Surplus City Liquidators

World's Largest Distributor of Excess Air Conditioning,
Heating & Refrigeration Equipment and Parts
Today's Special

CAPACITORS

October 31st, 2019


Click The Links Below to See Our Current Inventory of These Specific 
Products


Don't waste another minute paying high prices.
Let us SAVE YOU MONEY on
brand new and unused,
name brand
HVAC Equipment and Parts

 



AC Run Capacitors 




 



AC Run - Dual Rated Capacitors 




 



Start Capacitors 




 



Round Capacitors 




 



Oval Capacitors 








Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread G Mann via Mercedes
I believe I recall the postmortem on the event found a combination of lack
of spec post tension and failure to allow proper cure time for the
concrete.
Do not recall for sure, but my memory says, concrete was also sub spec for
strength in the mix.
Rush job, with failure on film as I recall..

On Thu, Oct 31, 2019 at 1:29 PM MG via Mercedes 
wrote:

> I believe it was incorrect tension.
>
> OK Don via Mercedes wrote:
> > The presence, or lack of them caused the collapse?
> >
> > On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
> > mercedes@okiebenz.com> wrote:
> >
> >>> Post tensioning cables.
> >>>
> >>> -D
> >> Is that not what caused the problem with that pedestrian bridge to some
> >> university down your way, that collapsed?
> >>
> >> Randy
> >>
> >
> >
>
> ___
> http://www.okiebenz.com
>
> To search list archives http://www.okiebenz.com/archive/
>
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>
>
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



[MBZ] ***SPAM*** RE: OT - Concrete Slab Construction

2019-10-31 Thread Greg Fiorentino via Mercedes
Concrete is very strong in compression, steel adds tensile strength.

Greg

-Original Message-
From: Mercedes [mailto:mercedes-boun...@okiebenz.com] On Behalf Of Craig via 
Mercedes
Sent: Thursday, October 31, 2019 12:29 PM
To: Mercedes Discussion List
Cc: Craig
Subject: Re: [MBZ] OT - Concrete Slab Construction

On Thu, 31 Oct 2019 14:00:29 -0500 Randy Bennell via Mercedes
 wrote:

> On 31/10/2019 1:48 PM, Dan--- via Mercedes wrote:
> > Figured it out after our afternoon walk:
> >
> > Post tensioning cables.
> >
> > -D
> 
> Is that not what caused the problem with that pedestrian bridge to some 
> university down your way, that collapsed?

Yes, IIRC. Post tensioning, however, has been used for many years with
very successful results.


Craig

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread MG via Mercedes

I believe it was incorrect tension.

OK Don via Mercedes wrote:

The presence, or lack of them caused the collapse?

On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
mercedes@okiebenz.com> wrote:


Post tensioning cables.

-D

Is that not what caused the problem with that pedestrian bridge to some
university down your way, that collapsed?

Randy






___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread OK Don via Mercedes
The presence, or lack of them caused the collapse?

On Thu, Oct 31, 2019 at 2:01 PM Randy Bennell via Mercedes <
mercedes@okiebenz.com> wrote:

>
> > Post tensioning cables.
> >
> > -D
>
> Is that not what caused the problem with that pedestrian bridge to some
> university down your way, that collapsed?
>
> Randy
>


-- 
OK Don

"Whenever you find yourself on the side of the majority, it is time to
pause and reflect." Mark Twain

"There are three kinds of men: The ones that learns by reading. The few who
learn by observation. The rest of them have to pee on the electric fence
for themselves."

WILL ROGERS, *The Manly Wisdom of Will Rogers*
2013 F150, 18 mpg
2017 Subaru Legacy, 30 mpg
1957 C182A, 12 mpg - but at 150 mph!
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Craig via Mercedes
On Thu, 31 Oct 2019 14:00:29 -0500 Randy Bennell via Mercedes
 wrote:

> On 31/10/2019 1:48 PM, Dan--- via Mercedes wrote:
> > Figured it out after our afternoon walk:
> >
> > Post tensioning cables.
> >
> > -D
> 
> Is that not what caused the problem with that pedestrian bridge to some 
> university down your way, that collapsed?

Yes, IIRC. Post tensioning, however, has been used for many years with
very successful results.


Craig

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Curt Raymond via Mercedes
 Ahh, you beat me to it...
-Curt

On Thursday, October 31, 2019, 3:01:23 PM EDT, Randy Bennell via Mercedes 
 wrote:  
 
 On 31/10/2019 1:48 PM, Dan--- via Mercedes wrote:
> Figured it out after our afternoon walk:
>
> Post tensioning cables.
>
> -D

Is that not what caused the problem with that pedestrian bridge to some 
university down your way, that collapsed?

Randy


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com

  
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Randy Bennell via Mercedes

On 31/10/2019 1:48 PM, Dan--- via Mercedes wrote:

Figured it out after our afternoon walk:

Post tensioning cables.

-D


Is that not what caused the problem with that pedestrian bridge to some 
university down your way, that collapsed?


Randy


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Dan--- via Mercedes
Figured it out after our afternoon walk:

Post tensioning cables.

-D

> On Oct 31, 2019, at 1:13 PM, Dan--- via Mercedes  
> wrote:
> 
> They’re now two floors up and there’s no sidewalk on that side of the street, 
> so we can’t ask. Otherwise we would.
> 
> Not the top floor - second floor of 18, I believe.
> 
> -D
> 
>> On Oct 31, 2019, at 12:25 PM, MG via Mercedes  wrote:
>> 
>> If it's the top floor of the parking deck then it might be for solar hot 
>> water heating.
>> 
>> MG
>> 
>> Dan--- via Mercedes wrote:
>>> Nope. If you closely, you can see the conduit (gray) run across the deck as 
>>> well.
>>> Note that it’s spaced pretty evenly in one direction, but the ones that 
>>> cross at 90 degrees are grouped closely together.
>>> It’s a mystery to us...
>>> -D
 On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
  wrote:
 
 Conduit for cables?
 
 --FT
 
> On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
> Here’s a better picture now that it’s out of the shade.
> 
> 
> 
>> On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes 
>>  wrote:
>> 
>> Nope. If you look closely, it’s not a loop or interconnected. The tubing 
>> is laid out in straight lines and in a grid arrangement, but it just 
>> ends up at the edge of the slab.
>> 
>> No need for floor heating in Florida. And the deck you see in the 
>> picture is for a parking garage.
>> 
>> -D
>> 
>>> On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
>>>  wrote:
>>> 
>>> Probably heating tubes
>>> 
>>> --FT
>>> 
 On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
 We’re puzzled by the red tubing that's being laid in the concrete 
 floors of a high rise building being built in the next block. It’s 
 clearly flexible, doesn’t appear to be interconnected as if it would 
 be passing liquids or gasses, so what is it?
 
 -D
 
 
 ___
 http://www.okiebenz.com
 
 To search list archives http://www.okiebenz.com/archive/
 
 To Unsubscribe or change delivery options go to:
 http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
 
>>> -- 
>>> --FT
>>> 
>>> ___
>>> http://www.okiebenz.com
>>> 
>>> To search list archives http://www.okiebenz.com/archive/
>>> 
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
 -- 
 --FT
 
 ___
 http://www.okiebenz.com
 
 To search list archives http://www.okiebenz.com/archive/
 
 To Unsubscribe or change delivery options go to:
 http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
 
>>> ___
>>> http://www.okiebenz.com
>>> To search list archives http://www.okiebenz.com/archive/
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
> 
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Dan--- via Mercedes
They’re now two floors up and there’s no sidewalk on that side of the street, 
so we can’t ask. Otherwise we would.

Not the top floor - second floor of 18, I believe.

-D

> On Oct 31, 2019, at 12:25 PM, MG via Mercedes  wrote:
> 
> If it's the top floor of the parking deck then it might be for solar hot 
> water heating.
> 
> MG
> 
> Dan--- via Mercedes wrote:
>> Nope. If you closely, you can see the conduit (gray) run across the deck as 
>> well.
>> Note that it’s spaced pretty evenly in one direction, but the ones that 
>> cross at 90 degrees are grouped closely together.
>> It’s a mystery to us...
>> -D
>>> On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
>>>  wrote:
>>> 
>>> Conduit for cables?
>>> 
>>> --FT
>>> 
 On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
 Here’s a better picture now that it’s out of the shade.
 
 
 
> On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  
> wrote:
> 
> Nope. If you look closely, it’s not a loop or interconnected. The tubing 
> is laid out in straight lines and in a grid arrangement, but it just ends 
> up at the edge of the slab.
> 
> No need for floor heating in Florida. And the deck you see in the picture 
> is for a parking garage.
> 
> -D
> 
>> On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
>>  wrote:
>> 
>> Probably heating tubes
>> 
>> --FT
>> 
>>> On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
>>> We’re puzzled by the red tubing that's being laid in the concrete 
>>> floors of a high rise building being built in the next block. It’s 
>>> clearly flexible, doesn’t appear to be interconnected as if it would be 
>>> passing liquids or gasses, so what is it?
>>> 
>>> -D
>>> 
>>> 
>>> ___
>>> http://www.okiebenz.com
>>> 
>>> To search list archives http://www.okiebenz.com/archive/
>>> 
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>> 
>> -- 
>> --FT
>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 
>>> -- 
>>> --FT
>>> 
>>> ___
>>> http://www.okiebenz.com
>>> 
>>> To search list archives http://www.okiebenz.com/archive/
>>> 
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>> 
>> ___
>> http://www.okiebenz.com
>> To search list archives http://www.okiebenz.com/archive/
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread MG via Mercedes
If it's the top floor of the parking deck then it 
might be for solar hot water heating.


MG

Dan--- via Mercedes wrote:

Nope. If you closely, you can see the conduit (gray) run across the deck as 
well.

Note that it’s spaced pretty evenly in one direction, but the ones that cross 
at 90 degrees are grouped closely together.

It’s a mystery to us...

-D


On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
 wrote:

Conduit for cables?

--FT


On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
Here’s a better picture now that it’s out of the shade.




On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  wrote:

Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
laid out in straight lines and in a grid arrangement, but it just ends up at 
the edge of the slab.

No need for floor heating in Florida. And the deck you see in the picture is 
for a parking garage.

-D


On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
 wrote:

Probably heating tubes

--FT


On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
We’re puzzled by the red tubing that's being laid in the concrete floors of a 
high rise building being built in the next block. It’s clearly flexible, 
doesn’t appear to be interconnected as if it would be passing liquids or 
gasses, so what is it?

-D


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Allan Streib via Mercedes
I'm no expert but in the all the construction I've seen, all plumbing
for sprinklers, domestic water, and sewer is installed below the slab.

My thought was that it's for cooling the poured concrete to get a
slower/stronger cure.

I agree -- ask someone on the site.

Allan

Floyd Thursby via Mercedes  writes:

> What is below the deck?  Might be for sprinklers?
>
> Go down and ask them!
>
> --FT
>
> On 10/31/19 11:00 AM, Dan--- via Mercedes wrote:
>> Nope. If you closely, you can see the conduit (gray) run across the deck as 
>> well.
>>
>> Note that it’s spaced pretty evenly in one direction, but the ones that 
>> cross at 90 degrees are grouped closely together.
>>
>> It’s a mystery to us...
>>
>> -D
>>
>>> On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
>>>  wrote:
>>>
>>> Conduit for cables?
>>>
>>> --FT
>>>
 On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
 Here’s a better picture now that it’s out of the shade.



> On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  
> wrote:
>
> Nope. If you look closely, it’s not a loop or interconnected. The tubing 
> is laid out in straight lines and in a grid arrangement, but it just ends 
> up at the edge of the slab.
>
> No need for floor heating in Florida. And the deck you see in the picture 
> is for a parking garage.
>
> -D
>
>> On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
>>  wrote:
>>
>> Probably heating tubes
>>
>> --FT
>>
>>> On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
>>> We’re puzzled by the red tubing that's being laid in the concrete 
>>> floors of a high rise building being built in the next block. It’s 
>>> clearly flexible, doesn’t appear to be interconnected as if it would be 
>>> passing liquids or gasses, so what is it?
>>>
>>> -D

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Floyd Thursby via Mercedes

What is below the deck?  Might be for sprinklers?

Go down and ask them!

--FT

On 10/31/19 11:00 AM, Dan--- via Mercedes wrote:

Nope. If you closely, you can see the conduit (gray) run across the deck as 
well.

Note that it’s spaced pretty evenly in one direction, but the ones that cross 
at 90 degrees are grouped closely together.

It’s a mystery to us...

-D


On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
 wrote:

Conduit for cables?

--FT


On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
Here’s a better picture now that it’s out of the shade.




On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  wrote:

Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
laid out in straight lines and in a grid arrangement, but it just ends up at 
the edge of the slab.

No need for floor heating in Florida. And the deck you see in the picture is 
for a parking garage.

-D


On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
 wrote:

Probably heating tubes

--FT


On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
We’re puzzled by the red tubing that's being laid in the concrete floors of a 
high rise building being built in the next block. It’s clearly flexible, 
doesn’t appear to be interconnected as if it would be passing liquids or 
gasses, so what is it?

-D


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Dan--- via Mercedes
Nope. If you closely, you can see the conduit (gray) run across the deck as 
well.

Note that it’s spaced pretty evenly in one direction, but the ones that cross 
at 90 degrees are grouped closely together.

It’s a mystery to us...

-D

> On Oct 31, 2019, at 10:57 AM, Floyd Thursby via Mercedes 
>  wrote:
> 
> Conduit for cables?
> 
> --FT
> 
>> On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:
>> Here’s a better picture now that it’s out of the shade.
>> 
>> 
>> 
>>> On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  
>>> wrote:
>>> 
>>> Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
>>> laid out in straight lines and in a grid arrangement, but it just ends up 
>>> at the edge of the slab.
>>> 
>>> No need for floor heating in Florida. And the deck you see in the picture 
>>> is for a parking garage.
>>> 
>>> -D
>>> 
 On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
  wrote:
 
 Probably heating tubes
 
 --FT
 
> On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
> We’re puzzled by the red tubing that's being laid in the concrete floors 
> of a high rise building being built in the next block. It’s clearly 
> flexible, doesn’t appear to be interconnected as if it would be passing 
> liquids or gasses, so what is it?
> 
> -D
> 
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 
 -- 
 --FT
 
 ___
 http://www.okiebenz.com
 
 To search list archives http://www.okiebenz.com/archive/
 
 To Unsubscribe or change delivery options go to:
 http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
 
>>> 
>>> ___
>>> http://www.okiebenz.com
>>> 
>>> To search list archives http://www.okiebenz.com/archive/
>>> 
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>> 
>>> 
>>> ___
>>> http://www.okiebenz.com
>>> 
>>> To search list archives http://www.okiebenz.com/archive/
>>> 
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>> 
> -- 
> --FT
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Floyd Thursby via Mercedes

Conduit for cables?

--FT

On 10/31/19 10:48 AM, Dan--- via Mercedes wrote:

Here’s a better picture now that it’s out of the shade.




On Oct 31, 2019, at 10:38 AM, Dan--- via Mercedes  wrote:

Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
laid out in straight lines and in a grid arrangement, but it just ends up at 
the edge of the slab.

No need for floor heating in Florida. And the deck you see in the picture is 
for a parking garage.

-D


On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
 wrote:

Probably heating tubes

--FT


On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
We’re puzzled by the red tubing that's being laid in the concrete floors of a 
high rise building being built in the next block. It’s clearly flexible, 
doesn’t appear to be interconnected as if it would be passing liquids or 
gasses, so what is it?

-D


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Curt Raymond via Mercedes
 Cooling? Run the AC into the floor of the parking structure?
-Curt

On Thursday, October 31, 2019, 10:44:55 AM EDT, Curley McLain via Mercedes 
 wrote:  
 
 They could be doing an exposed manifold  at the ends.

Dan--- via Mercedes wrote on 10/31/19 9:38 AM:
> Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
> laid out in straight lines and in a grid arrangement, but it just ends up at 
> the edge of the slab.
>
> No need for floor heating in Florida. And the deck you see in the picture is 
> for a parking garage.
>
> -D
>
>> On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
>>  wrote:
>>
>> Probably heating tubes
>>
>> --FT
>>
>>> On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
>>> We’re puzzled by the red tubing that's being laid in the concrete floors of 
>>> a high rise building being built in the next block. It’s clearly flexible, 
>>> doesn’t appear to be interconnected as if it would be passing liquids or 
>>> gasses, so what is it?
>>>
>>> -D
>>>
>>>
>>> ___
>>> http://www.okiebenz.com
>>>
>>> To search list archives http://www.okiebenz.com/archive/
>>>
>>> To Unsubscribe or change delivery options go to:
>>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>>
>> -- 
>> --FT
>>
>> ___
>> http://www.okiebenz.com
>>
>> To search list archives http://www.okiebenz.com/archive/
>>
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>>
>
> ___
> http://www.okiebenz.com
>
> To search list archives http://www.okiebenz.com/archive/
>
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com

  
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] Clean 300TD on BAT

2019-10-31 Thread Curt Raymond via Mercedes
 Oh man, for the multi-link suspensions I totally agree. Used ta be cheaper to 
buy all the links at once too.
My last MB Indy preferred to fix things as they broke, felt weird to have to 
make him do it all at once. Maybe he got more $$ in labor doing them one at a 
time.

-Curt

On Wednesday, October 30, 2019, 9:21:53 PM EDT, Curley McLain via Mercedes 
 wrote:  
 
 Having done the 124 300D rear subframe piecemeal, several times, I have 
to agree with Jaime.  I did the rear of the 81 240D all at once.  That 
is a FAR superior way to do it.   In the end, the last 2 times I did the 
rear of 124s, I did it all at once.   I won't do piecemeal anymore, 
unless it is a short term emergency.

Andrew Strasfogel via Mercedes wrote on 10/30/19 3:13 PM:
> Sure.  If I had won the auction I would probably drive it and repair issues
> on a piecemeal basis, as symptoms are observed.
>
>


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com

  
___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Curley McLain via Mercedes

They could be doing an exposed manifold  at the ends.

Dan--- via Mercedes wrote on 10/31/19 9:38 AM:

Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
laid out in straight lines and in a grid arrangement, but it just ends up at 
the edge of the slab.

No need for floor heating in Florida. And the deck you see in the picture is 
for a parking garage.

-D


On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
 wrote:

Probably heating tubes

--FT


On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
We’re puzzled by the red tubing that's being laid in the concrete floors of a 
high rise building being built in the next block. It’s clearly flexible, 
doesn’t appear to be interconnected as if it would be passing liquids or 
gasses, so what is it?

-D


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com




___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Dan--- via Mercedes
Nope. If you look closely, it’s not a loop or interconnected. The tubing is 
laid out in straight lines and in a grid arrangement, but it just ends up at 
the edge of the slab.

No need for floor heating in Florida. And the deck you see in the picture is 
for a parking garage.

-D

> On Oct 31, 2019, at 10:23 AM, Floyd Thursby via Mercedes 
>  wrote:
> 
> Probably heating tubes
> 
> --FT
> 
>> On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:
>> We’re puzzled by the red tubing that's being laid in the concrete floors of 
>> a high rise building being built in the next block. It’s clearly flexible, 
>> doesn’t appear to be interconnected as if it would be passing liquids or 
>> gasses, so what is it?
>> 
>> -D
>> 
>> 
>> ___
>> http://www.okiebenz.com
>> 
>> To search list archives http://www.okiebenz.com/archive/
>> 
>> To Unsubscribe or change delivery options go to:
>> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
>> 
> -- 
> --FT
> 
> ___
> http://www.okiebenz.com
> 
> To search list archives http://www.okiebenz.com/archive/
> 
> To Unsubscribe or change delivery options go to:
> http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com
> 


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com



Re: [MBZ] OT - Concrete Slab Construction

2019-10-31 Thread Floyd Thursby via Mercedes

Probably heating tubes

--FT

On 10/31/19 10:18 AM, Dan--- via Mercedes wrote:

We’re puzzled by the red tubing that's being laid in the concrete floors of a 
high rise building being built in the next block. It’s clearly flexible, 
doesn’t appear to be interconnected as if it would be passing liquids or 
gasses, so what is it?

-D


___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com


--
--FT

___
http://www.okiebenz.com

To search list archives http://www.okiebenz.com/archive/

To Unsubscribe or change delivery options go to:
http://mail.okiebenz.com/mailman/listinfo/mercedes_okiebenz.com