ID: 14138
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Status: Closed
Bug Type: Date/time related
Operating System: Debian GNU/Linux stable
PHP Version: 4.0.6
New Comment:
I'm curious, what do you think the problem was? libc6-dev and libc6 mismatch? I
haven't kept a track of
ID: 14138
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Status: Open
Bug Type: Date/time related
Operating System: Debian GNU/Linux stable
PHP Version: 4.0.6
New Comment:
Recompiled 4.1.0RC3 using Apache 1.3.22.
Yes, mathematics now works correctly. Haven't tested fully yet
ID: 14138
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Old Status: Feedback
Status: Open
Bug Type: Date/time related
Operating System: Debian GNU/Linux stable
PHP Version: 4.0.6
New Comment:
Linux 2.4.12 SMP
Debian potato libraries
Package: libc5
Version: 5.4.46-3
Pac
From: [EMAIL PROTECTED]
Operating system: Debian GNU/Linux stable
PHP version: 4.0.6
PHP Bug Type: Date/time related
Bug description: date arithmetic scrambled
There seems to be some voodoo in this script ...
for ( $i = -7 ; $i < 28 ; $i ++ ) {
$day = date('d');
ID: 13704
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Old Status: Feedback
Status: Open
Bug Type: Apache related
Operating System: Debian stable
PHP Version: 4.0CVS-2001-10-17
New Comment:
It's been filed as "mod_negotiation/8582".
http://bugs.apache.org/index.cgi/full/85
ID: 13704
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Old Status: Feedback
Status: Open
Bug Type: Apache related
Operating System: Debian stable
PHP Version: 4.0CVS-2001-10-17
New Comment:
I'm just poking their newsgroup and bug database and can't find anything similiar.
Pr
ID: 13704
User updated by: [EMAIL PROTECTED]
Reported By: [EMAIL PROTECTED]
Status: Open
Bug Type: Apache related
Operating System: Debian stable
PHP Version: 4.0CVS-2001-10-17
New Comment:
I changed back to PHP 4.0.6 which didn't have this problem. Still using Apache 1.3.22.
The problem still m