On Thu, May 29, 2014 at 04:22:39PM -0700, sinical wrote:
Hi List (Sorry if this is a doubleup I cant seem to post even though I am
subscribed),
Trying to make a performance report where the x-axis value is the Ticket
ID so we can see if a job was done on time (Due Date set via the SLA
Hi List (Sorry if this is a doubleup I cant seem to post even though I am
subscribed),
Trying to make a performance report where the x-axis value is the Ticket
ID so we can see if a job was done on time (Due Date set via the SLA
Extension)
However I couldn't select this as an option in the