Thanks, Jakob! I guess it's time to give the manual a thorough reading.
Best regards,
Albert
On Thu, Oct 3, 2019 at 2:52 PM Jakob Erdmann wrote:
> Yes. Double connection can be created with ctrl+click in netedit:
> https://sumo.dlr.de/docs/NETEDIT.html#changing_connections
>
>
>
> Am Do., 3.
Yes. Double connection can be created with ctrl+click in netedit:
https://sumo.dlr.de/docs/NETEDIT.html#changing_connections
Am Do., 3. Okt. 2019 um 23:34 Uhr schrieb Albert Jeans :
> Hi Jakob,
>
> Thanks as always for your prompt reply. I'm still a new user of SUMO so
> I'm afraid I don't
Hi Jakob,
Thanks as always for your prompt reply. I'm still a new user of SUMO so I'm
afraid I don't understand the construction shown in
https://sumo.dlr.de/docs/Simulation/Motorways.html#combined_on-off-ramps
Is it two edges on the left, joined to one edge with 3 lanes in the middle,
then
1) This sounds as if those vehicles prefer a particular lane for strategic
reasons (to avoid mandatory lane-change later during their route)
2) vehicles in sumo also try to get into the correct lane as soon as
possible. On short weaving sections they may not always manage to do so.
You can fix
Hi,
I have one lane making a turn into either of two lanes. However, when one
of the two destination lanes is filled with vehicles, the turning vehicle
does not always turn into the unoccupied lane but instead waits for the
full lane to clear. Does that mean vehicles cannot change lanes once