Hello,
the statistics summary cannot be printed to an xml file at the moment. You
could use the --summary-output which outputs information every step and
check the time stamp of the last output value.
regards,
Jakob
2017-02-06 5:28 GMT+01:00 Thaer Thaher :
> Dear,
>
>
Dear,
To simulate all vehicles no value for --end has been given. The
(--duration-log.statistics) option will print averages for vehicles trip like
the simulation time. can we output these results to an external xml file.
I'm interested in finding the required time to simulate all vehicles
Hi,
I have difficulties in using simulation step (0x02) command. Assume that
the time step is 100 ms (0.1s). Calling simulation step command with 100
does not proceed the simulation to 100 ms. I am looking at the
simulation time step at the top of sumo-gui and it is still zero.
Calling
Hi all,
I generated a simulation with OD matrix input (from time 0.00 to time 1.00),
and simulation time from 0 to 86400 (in command line). However, the generated
output trace only contains information from 0 o roughly 3800 and then there's
no other vehicles generated. Do you know what I should
Hello,
your matrix should contain time information in its cells. You may use a
single matrix for 24 hours and scale the demand with a load-curve (see
--timeline options)
regards,
Jakob
2015-02-01 22:16 GMT+01:00 nguyen tran meanmechoime...@yahoo.com:
Hi all,
I generated a simulation with OD