Egypt accuses Ethiopia of stalling talks on Nile Dam project

   - Article <http://www.sudantribune.com/spip.php?article57300#tabs-1>
   - Comments (0) <http://www.sudantribune.com/spip.php?article57300#tabs-2>

[image: email] Email
<http://www.sudantribune.com/spip.php?iframe&page=enviar_email_articulo&id_article=57300>
[image: print] Print
<http://www.sudantribune.com/spip.php?iframe&page=imprimable&id_article=57300>
[image: pdf]Save
<http://www.sudantribune.com/spip.php?page=spipdf&spipdf=spipdf_article&id_article=57300&nom_fichier=article_57300>
[image: separation]
[image: increase] <http://www.sudantribune.com/spip.php?article57300#>
[image: decrease] <http://www.sudantribune.com/spip.php?article57300#>
[image: separation]
[image: separation]

   - [image: Inline image 1]
   
<http://www.facebook.com/sharer/sharer.php?u=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57300&t=Egypt%20accuses%20Ethiopia%20of%20stalling%20talks%20on%20Nile%20Dam%20project%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan>
   - [image: Inline image 2]
   
<http://www.myspace.com/Modules/PostTo/Pages/?u=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57300&t=Egypt%20accuses%20Ethiopia%20of%20stalling%20talks%20on%20Nile%20Dam%20project%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan>
   - [image: Inline image 3]
   
<http://twitter.com/share?text=Egypt%20accuses%20Ethiopia%20of%20stalling%20talks%20on%20Nile%20Dam%20project%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan&url=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57300>
   - [image: Inline image 4]
   
<http://buzz.yahoo.com/submit?submitUrl=http%3A%2F%2Fwww.sudantribune.com%2Fspip.php%3Farticle57300&submitHeadline=Egypt%20accuses%20Ethiopia%20of%20stalling%20talks%20on%20Nile%20Dam%20project%20-%20Sudan%20Tribune%3A%20Plural%20news%20and%20views%20on%20Sudan&submitSummary=%20By%20Tesfa-Alem%20Tekle%20December%208%2C%202015%20%28ADDIS%20ABABA%29%20%E2%80%93%20Egypt%20has%20accussed%20Ethiopia%20of%20delaying%20tripartite%20negotiations%20on%20a%20controversial%20dam%20%28...%29%20>

------------------------------

By Tesfa-Alem Tekle

December 8, 2015 (ADDIS ABABA) – Egypt has accussed Ethiopia of delaying
tripartite negotiations on a controversial dam project the latter is
building along the Nile River.
[image: JPEG - 19.2 kb]*The planned Grand Ethiopian Renaissance Dam project
(AP)*

Cairo’s accusation comes after a planned meeting to discuss Ethiopia’s dam
project known as the Grand Renaissance Dam was postponed till next week.

The foreign and irrigation ministers of Egypt, Ethiopia and Sudan were to
hold a meeting in Khartoum from 6-7 Dcember, but was postponed till 11 and
12 December.

In an interview with Egypt’s *Al-Masry Al-Youm* newspaper, the Egyptian
irrigation minister’s adviser, Meghawry Shehata, accused Ethiopia of
postponing the latest meeting.

Ethiopia, however, said the meeting’s postponement was because the
Ethiopian foreign affairs minister, Tedros Adhanom, would be in Kenya to
launch an integrated border peace program aimed to end border conflicts
along the Ethiopia-Kenya common border.

The Egyptian official claimed Ethiopia was deliberately stalling
negotiations in order to buy time and reach a construction stage that makes
it difficult to demolish the new dam.

“We have been negotiating for six months, whereas we should have finished
in just one month”, Shehata said.

Egypt fears the construction of what would be Africa’s largest dam would
eventually diminish its water share. The North African nation sees the dam
project as a threat to its water security and has previously even
considered military options to halt the project.

Ethiopia, however, argues that the construction of the power project was
never meant to harm any of the down stream countries (Egypt and Sudan) and
insists on its completion, despite external pressure.

Shehata said if the dam project was deemed a threat to Egypt, then Cairo
would ask Ethiopia to stop building it further and will instead compensate
Ethiopia for the electricity it intends to generate from the dam.

“Egypt should resort to global institutions to find out if Ethiopia has
other motives”, he said, adding “Egypt’s reaction should be firm and
strong”.

Meanwhile Sudanese president Omar Al-Bashir said mutual trust and
cooperation is needed between the Egypt, Ethiopia and Sudan to ensure the
power project is a reality.

Unlike Egypt, Sudan had been expressing support to Ethiopia’s Nile dam
project and further offered to provide technical support for the project to
succeed.

In an interview conducted on *Al-Arabiya* Saturday, Bashir said Egypt’s
ex-president Mohamed Morsi’s rule allegedly heightened tensions between
Ethiopia and Egypt.

“Some Egyptian officials under the rule of Morsi who were non-Islamists
appeared on air directly threatening Ethiopia, claiming that they would
support the opposition and launch military operations targeting the dam
itself”, said Bashir.

The over $ 4 billion power plant project, expected to be completed in 2017,
will have electricity generating capacity of 6,000 MW. The dam is currently
50 percent completed.

(ST)

-- 
To post to this group, send email to [email protected]
To unsubscribe from this group, send email to 
[email protected]
Visit this group at https://groups.google.com/d/forum/southsudankob
View this message at 
https://groups.google.com/d/msg/southsudankob/topic-id/message-id
For more options, visit https://groups.google.com/d/optout
--- 
You received this message because you are subscribed to the Google Groups 
"South Sudan Info - The Kob" group.
To unsubscribe from this group and stop receiving emails from it, send an email 
to [email protected].
To post to this group, send email to [email protected].
Visit this group at http://groups.google.com/group/SouthSudanKob.
To view this discussion on the web visit 
https://groups.google.com/d/msgid/SouthSudanKob/CAJb14opQ2YQnKSxSTJQ7-3wQxet52SQ9HqQLFDTCMq709RusRQ%40mail.gmail.com.
For more options, visit https://groups.google.com/d/optout.

Reply via email to