Hi Jonathan, list, after installing the primary 9.1 just start ArchMgr (not SpectroServer) on this host and wait until "Locally stored Events" (SpectroServer Control) states no local events left. After this start the 9.1 SpectroServer. This way the secondary SpectroServer (8.1) has the chance to send all it's stored events to ArchMgr and no events will get lost.
Regards, Marcel On Tue, Sep 29, 2009 at 1:08 PM, Page, Jonathan <[email protected]>wrote: > I have two 8.1 SpectroServers setup in HA mode. To upgrade my > SpectroServers I was going to fail my 8.1 SpectroServer to the backup and > then install the 9.1 as the Primary SpectroServer on a new machine with the > same landscape name and the same databases. > > I was then going to bring up this Primary 9.1 SpectroServer and if it works > the events on the Secondary 8.1 SpectroServer would be sent over to the new > server. Has anyone else tried this and if so did you run into any issues > with compatibility? > > Thanks, > Jonathan > --- > To unsubscribe from spectrum, send email to [email protected] with the > body: unsubscribe spectrum [email protected] > --- To unsubscribe from spectrum, send email to [email protected] with the body: unsubscribe spectrum [email protected]
