Thom wasn't being condescending, just trying to convey that there are
other issues to consider when laying out systems besides just pressure
and flow.  Don't take it personal. 


Craig L. Prahl, CET
Fire Protection Group
Mechanical Department
CH2MHILL
Lockwood Greene
1500 International Drive
PO Box 491, Spartanburg, SC  29304-0491
Direct - 864.599.4102
Fax - 864.599.8439
[EMAIL PROTECTED]
http://www.lg.com


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Brian
Harris
Sent: Tuesday, March 27, 2007 11:08 AM
To: [email protected]
Subject: RE: Selecting Heads For a New System

Thom,
Whoa there fella - I don't know if you meant to sound so condescending
but it certainly came across that way. I was only looking for other
people's opinions, ideas, etc. While I might be considered a sprinkler
"rookie" I do have 20+ years in engineering.

           Regards,
              Brian Harris
First Defense Fire Protection
        Design Engineer
   [EMAIL PROTECTED]
           704.948.3506 phone
           704.948.3507 fax

 

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Thom
McMahon
Sent: Tuesday, March 27, 2007 11:03 AM
To: [email protected]
Subject: Re: Selecting Heads For a New System

Design 101: Always remember that if the number of heads for a project
remains the same, and the number of branch lines is less the job costs
less to install.
Minimize the number of branchlines by maximizing the spacing between
branch lines, an allowing the heads on the branch lines to move closer
together.
Recognize the use of your design. Retail in a mall? Lots of tenant
changes, smaller head spacing means more flexibility for the next
tenant. End user store, they'll probably be there for 20 years, maximize
the coverage, you don't need flexibility for the next tenant.

AFSA and NFSA both have designer training which is where you should
really be asking these types of questions. Every contractor has there
own approach to this depending on their preferred products, and
preferred installation methods. Get a mentor! AFSA may be able to help
you locate one near you, someone with experience that can work with you
one on one. While this forum is a wonderful resource, it can't provide
the level of training your in need

of.

Thom McMahon
Firetech, Inc.
2560 Copper Ridge Dr
Steamboat Springs, CO 80488-2136
Tel: 970-879-7952
Fax: 970-879-7926
----- Original Message -----
From: "Brian Harris" <[EMAIL PROTECTED]>
To: <[email protected]>
Sent: Tuesday, March 27, 2007 7:52 AM
Subject: RE: Selecting Heads For a New System


> I'm looking for a way to take the given information (static, residual,

> flow)
> for a given job and come up with a head spacing (standard or extended
> coverage) that will work.
>
>           Regards,
>              Brian Harris
> First Defense Fire Protection
>        Design Engineer
>   [EMAIL PROTECTED]
>           704.948.3506 phone
>           704.948.3507 fax
>
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
> [mailto:[EMAIL PROTECTED] On Behalf Of Paul 
> Pinigis
> Sent: Tuesday, March 27, 2007 9:46 AM
> To: [email protected]
> Subject: RE: Selecting Heads For a New System
>
> I don't know if this is what you are looking for, but if you use a
> sprinkler with a k-factor of 8.0 then the optimum area per sprinkler
(to
> minimize pressure demand) is 106 square feet.  Maybe a 10 x 10.5 foot
> spacing.
>
> The approach that you take will differ depending upon the ALL of the
> factors associated with the project.  A holistic approach to each
> project is needed.
>
> Paul J. Pinigis, P.E.
> Chief Life Safety Engineer
>
> -----Original Message-----
> From: [EMAIL PROTECTED]
> [mailto:[EMAIL PROTECTED] On Behalf Of Brian
> Harris
> Sent: Tuesday, March 27, 2007 8:35 AM
> To: [email protected]
> Subject: Selecting Heads For a New System
>
> Let me start by saying I've only been in the sprinkler world for just
> over a
> year so if any thing I ask is "rookie-ish" please keep that in mind.
I'm
> looking for ideas that some of you may use when starting a new project
> when
> it comes to selecting what heads (head spacing) to use. For example: I
> am
> starting a retail store (mercantile) that has a Static of 47 psi
> Residual of
> 42 psi, & flow of 1090 gpm. What I do now to get me "in the ballpark"
is
> take the density x area of operation x 1.4 (for overage) + hose
> allowance.
> That gets me roughly the system gpm demand.  So .20 x 1500 = 300 x 1.4
=
> 420
> + 250 (hose) = 670 gpm.  I then plot that gpm on my water supply curve
> (N1.85) to get the psi for that gpm; in this case that's around 45psi.
> From
> that psi I take out for the BFP, elevation, 40% (friction loss & etc)
> and
> whatever is left I find a head with an end head pressure that's
slightly
> under that and away I go.... Any thoughts? Suggestions? Better Ideas?
>
>
>
>           Regards,
>
>              Brian Harris
> First Defense Fire Protection
>
>
>   <mailto:[EMAIL PROTECTED]> [EMAIL PROTECTED]
>           704.948.3506 phone
>           704.948.3507 fax
>
>
>
>
>
>
>
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>
> _______________________________________________
> Sprinklerforum mailing list
> [email protected]
> http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
>
> 


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

Reply via email to