A picture's worth a thousand words. Haven't seen any piece by piece assembly text anywhere.
That's the way to do it, if in doubt contact your pump supplier and he may be able to provide some additional data. What is the engineer challenging about this arrangement? Examples that show what you've described: Fig. A.5.24.4 (2007) Fig. A.6.3.1 (2007) Fig. A 7.3.1 (2007) And the list goes on. Should be no debate. Craig L. Prahl, CET Fire Protection Group Mechanical Department CH2MHILL Lockwood Greene 1500 International Drive PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - 864.599.8439 [EMAIL PROTECTED] http://www.lg.com -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of FPDC Sent: Wednesday, September 19, 2007 10:06 AM To: [email protected] Subject: pump test header location The diagrams in NFPA 20 show the connection for the test header prior to the valve on the discharge side of the pump. However, the diagrams are located in the appendix and I can't seem to find any text reference to it within the standard. Coul; someone enlighten me if the is any and if so, where? I've called for this and am being challenged by an engineer. Thanks Todd G. Williams, PE Fire Protection Design/Consulting Stonington, Connecticut www.fpdc.com 860.535.2080 _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)
