tread very very carefully when answering fire protection questions on
the building. The engineer is suppose to be involved for that exact
thing and early not later in a project. Helping a client is one
thing. Allowing them to avoid asking questions of the appropriate
source is another. IF they think they have an answer form a reliable
source, do you think they are going to get it confirmed by an
engineer? No need to ask your broker if your insurance covers such
activities.
Roland
On Feb 12, 2008, at 8:31 AM, Gregory Lindholm wrote:
I have been asked to quote a small project that will have some
mixing & packaging of a product with isopropyl alcohol and aromatic
100 naptha. The storage tanks for these projects are located
outside the building, with the liquids piped into the building. The
"manufacturing room" for this is only 20' x 20', and the "packaging
room" is 20' x 30'. The entire building is only 50' x 60'.
Any thoughts from the forum? This is completely new for me.
The GC is asking me if I knew if this building would be classified
as "F" or "H" occupancy. (I know, these questions should be being
taken care of by an engineer, but it has not gotten that far yet.)
Greg Lindholm
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
To Unsubscribe, send an email to:Sprinklerforum-
[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)