The 08 edition of NFPA 25 addresses just this aspect by stating the
system must be drained after system operation, before freezing
weather, and as often thereafter as needed
Roland
On Feb 19, 2008, at 8:40 AM, Rod DiBona wrote:
We always do this even if it means that the first inspection is
before a
year or a little after a year. Even when properly sloped and drained
after a trip there will be build up of water later.
Rod DiBona
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum
To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)