I think you reading the wrong thing. What does it say for the site 
classification just below that?
-----Original Message-----
From: "Brian Harris" <[EMAIL PROTECTED]>

Date: Wed, 20 Feb 2008 16:46:51 
To:<[email protected]>
Subject: RE: General Seismic Question


Yeah, "B", "C", & "D"


Brian Harris
FDFP INC.

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Keith Pepin
Sent: Wednesday, February 20, 2008 4:22 PM
To: [email protected]
Subject: Re: General Seismic Question

Does the appendix indicate the siesmic design category?
-----Original Message-----
From: "Brian Harris" <[EMAIL PROTECTED]>

Date: Wed, 20 Feb 2008 11:52:55
To:<[email protected]>
Subject: RE: General Seismic Question


On the appendix sheet it called for mechanical components to be anchored and
on the sealed FP sheets is said the sprinkler contractor was responsible to
determine if seismic was required. Because of the timeframe, etc. we
excluded Seismic in our bid.


Brian Harris
FDFP INC.

-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of
[EMAIL PROTECTED]
Sent: Wednesday, February 20, 2008 11:25 AM
To: [email protected]
Subject: RE: General Seismic Question

Was seismic bracing called for as being required in the design documents?


Craig L. Prahl, CET
Fire Protection Group
Mechanical Department
CH2MHILL
Lockwood Greene
1500 International Drive
PO Box 491, Spartanburg, SC  29304-0491
Direct - 864.599.4102
Fax - 864.599.8439
[EMAIL PROTECTED]
http://www.lg.com


-----Original Message-----
From: [EMAIL PROTECTED]
[mailto:[EMAIL PROTECTED] On Behalf Of Brian Harris
Sent: Wednesday, February 20, 2008 11:00 AM
To: [email protected]
Subject: General Seismic Question

We have a job that we bid which excluded seismic bracing, we are suppose to
start hanging pipe on Monday the 25th. The GC is now telling us that we need
to include seismic and he expects us to eat the cost, if we don't he's going
to use the 2nd place bidder. He says that it was our responsibility to
determine if seismic was required or not.

1.      Is it ever the sprinkler man's job to determine if seismic is
required? I think not...
2.      If you exclude items in your bid and are awarded the contract
isn't
a change order at this point a no brainer?
3.      Can he legally ditch us at this point and go to the number 2
bidder,
we already have pipe fabricated?



Regards,


<http://www.firstdefensefire.com/>




_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)


_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum

To Unsubscribe, send an email to:[EMAIL PROTECTED]
(Put the word unsubscribe in the subject field)

Reply via email to