I think you reading the wrong thing. What does it say for the site classification just below that? -----Original Message----- From: "Brian Harris" <[EMAIL PROTECTED]>
Date: Wed, 20 Feb 2008 16:46:51 To:<[email protected]> Subject: RE: General Seismic Question Yeah, "B", "C", & "D" Brian Harris FDFP INC. -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Keith Pepin Sent: Wednesday, February 20, 2008 4:22 PM To: [email protected] Subject: Re: General Seismic Question Does the appendix indicate the siesmic design category? -----Original Message----- From: "Brian Harris" <[EMAIL PROTECTED]> Date: Wed, 20 Feb 2008 11:52:55 To:<[email protected]> Subject: RE: General Seismic Question On the appendix sheet it called for mechanical components to be anchored and on the sealed FP sheets is said the sprinkler contractor was responsible to determine if seismic was required. Because of the timeframe, etc. we excluded Seismic in our bid. Brian Harris FDFP INC. -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of [EMAIL PROTECTED] Sent: Wednesday, February 20, 2008 11:25 AM To: [email protected] Subject: RE: General Seismic Question Was seismic bracing called for as being required in the design documents? Craig L. Prahl, CET Fire Protection Group Mechanical Department CH2MHILL Lockwood Greene 1500 International Drive PO Box 491, Spartanburg, SC 29304-0491 Direct - 864.599.4102 Fax - 864.599.8439 [EMAIL PROTECTED] http://www.lg.com -----Original Message----- From: [EMAIL PROTECTED] [mailto:[EMAIL PROTECTED] On Behalf Of Brian Harris Sent: Wednesday, February 20, 2008 11:00 AM To: [email protected] Subject: General Seismic Question We have a job that we bid which excluded seismic bracing, we are suppose to start hanging pipe on Monday the 25th. The GC is now telling us that we need to include seismic and he expects us to eat the cost, if we don't he's going to use the 2nd place bidder. He says that it was our responsibility to determine if seismic was required or not. 1. Is it ever the sprinkler man's job to determine if seismic is required? I think not... 2. If you exclude items in your bid and are awarded the contract isn't a change order at this point a no brainer? 3. Can he legally ditch us at this point and go to the number 2 bidder, we already have pipe fabricated? Regards, <http://www.firstdefensefire.com/> _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field) _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)
_______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/mailman/listinfo/sprinklerforum To Unsubscribe, send an email to:[EMAIL PROTECTED] (Put the word unsubscribe in the subject field)