One of our accounts is in the process of writing specs for a new building.  
They have asked for my advice.  I would to have a wet system used in the 
building.  The future maintenance of dry systems, dry heads, and antifreeze 
loops is something I would like to avoid.  

We have a couple of accounts that insulated the slope of the roof, and a couple 
that tented the wet system with plastic and used blown-in insulation.  To date, 
we have not had to replace rusted pipe, or dealt with antifreeze loops or dry 
heads in those places. My preference would be to insulate the roof.  What is 
the experience of members of the board?  
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://fireball.firesprinkler.org/mailman/listinfo/sprinklerforum

For Technical Assistance, send an email to: [email protected]

To Unsubscribe, send an email to:[email protected]
(Put the word unsubscribe in the subject field)

Reply via email to