I have a customer that has a dry system that was installed sometime in the 50's 
or early 60's.  We are inspecting this system and notice that the trip times 
are well over a minute, almost a minute and a half.  Now a days that would be 
no good; but how was that handled back then?  It is a pipe schedule system, so 
was the volume rule in affect at that time?

 
Jay Stough
_______________________________________________
Sprinklerforum mailing list
[email protected]
http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org

Reply via email to