I am designing a project with cloud ceiling and large ducts, 74" x 23",
with plumbing and other piping filling most of the other space around the
ducts across the corridor.  I understand that I need heads above the
ceiling but how do I balance the need for heads above the ceiling space and
the area taken up by the ducts and other piping. Based on what is know
about the duct work location it looks like I would not be able to get heads
above the ducts.

Am I thinking correctly to protect under the ducts but above the ceiling?

Any thoughts would be appreciated.

Thanks


-- 
Craig Leadbetter