IBC Chapter 2 calls a basement a story, and a story as the space between 
floors. Also the distance between finished floors.

Vault is defined elsewhere as an underground chamber basically.
Seems clear-cut until we are asked to prove.

What is a "Splice Vault" anyway?
Is the vault pre-made then lowered into position? Like our valve vaults?


R/
Matt

Matthew J. Willis, CWBSP
Design Manager /3-D Specialist
Rapid Fire Protection Inc.<http://rapidfireinc.com/>
1530 Samco Road
Rapid City, SD 57702
Office-605.348.2342
Direct Line-605.593.5063
Cell-605.391.2733
Fax:-605.348.0108

[cid:[email protected]]

From: Sprinklerforum <[email protected]> On Behalf 
Of Jerry Van Kolken
Sent: Tuesday, August 28, 2018 5:28 PM
To: [email protected]
Subject: When is it a Floor?

I have a 2 story building with a 600sqft "Splice Vault" underneath it. The 
reviewer is calling this out as basement, hence 3 stories, which would require 
floor controls. In 13-8.2.4 (2016) it discuss floor controls not being required 
in apartment situations, and floor areas above, but nothing for below. Is there 
any references I could look at to not have to install extra floor controls?

Jerry Van Kolken
Millennium Fire Protection Corp.
2950 San Luis Rey Rd.
Oceanside, CA 92058
(760) 722-2722 FX 722-2730