For the safety of the installers so they do not have to climb up in the top of an attic or have to make make-shift ladders, I typically try to put the main down the middle for the BB's at chest high and use sprigs. This also helps with getting over mechanical equipment/duct that may be in the attic space. Then I run a low main around the outside edges, looped, to catch the sprinklers around the eves and any pendent sprinklers for the area below. When I use Attic Sprinklers I try my best to use CPVC if it is wet and the water supply is good. (Wet systems in attics. Maybe a Florida thing.)
Thank You, Mickey Ferguson Design Technician/Project Manager Wayne Automatic Fire Sprinklers, Inc. (r) 222 Capitol Court Ocoee, FL 34761<https://www.google.com/maps/place/Wayne+Automatic+Fire+Sprinklers/@28.5609916,-81.5534771,19.65z/data=!4m13!1m7!3m6!1s0x88e782fb5aadbabf:0xd7238f1eab6eb876!2s222+Capitol+Ct,+Ocoee,+FL+34761!3b1!8m2!3d28.5607736!4d-81.5533424!3m4!1s0x88e782fb33d24d9d:0x9e453facd228f6f7!8m2!3d28.5609763!4d-81.5532511> ph: 4078775582<tel:4078775582> cell: 4079512009<tel:4079512009> Ocoee<https://www.waynefire.com/locations/ocoee-florida-orlando> | Jacksonville<https://www.waynefire.com/locations/jacksonville-florida> | Deerfield Beach<https://www.waynefire.com/locations/deerfield-florida> | Tampa<https://www.waynefire.com/locations/tampa-florida> | Ft Myers<https://www.waynefire.com/locations/ft-meyers-florida> | Concord, NC<https://www.waynefire.com/locations/concord-north-carolina-charlotte> From: Sprinklerforum <[email protected]<mailto:[email protected]>> On Behalf Of Brian Harris via Sprinklerforum Sent: Wednesday, October 27, 2021 7:04 AM To: [email protected]<mailto:[email protected]> Cc: Brian Harris <[email protected]<mailto:[email protected]>> Subject: Attic Piping Seems were seeing more and more wood framed buildings these days and with that comes attics. Just curious what the general school of thought is with running piping in these spaces. Is it better to run the Main high under the ridges with back to back heads (size permitting) or is it better run Mains low and then run smaller Mains up the slope feeding branches at the ridges? I'm working on a job now that kinda resembles a long rectangle with no center (courtyards). I have all the heads laid out with B/B at the ridges, some AP's in the corners & throughout as needed. Just looking for ideas from some of you with much more attic experience than I have. Brian Harris, CET BVS Systems Inc. Design Manager bvssystemsinc.com<http://bvssystemsinc.com><http://bvssystemsinc.com/<http://bvssystemsinc.com>> Phone: 704.896.9989 Fax: 704.896.1935 _______________________________________________ Sprinklerforum mailing list [email protected]<mailto:[email protected]> http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org<http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org> _______________________________________________ Sprinklerforum mailing list [email protected] http://lists.firesprinkler.org/listinfo.cgi/sprinklerforum-firesprinkler.org