We've been asked to provide the AHJ with something in writing stating adding (1) head to a non-sprinkled building for the gas storage room in a dentist office meets section 903.3.8 in the 2018 IBC, and specifically 903.3.8.3 and 903.3.8.5. Any pointers? I can't imagine doing full shop drawings, calc one head, as a plan B.....
Brian Harris, CET BVS Systems Inc. Design Manager bvssystemsinc.com<http://bvssystemsinc.com/> Phone: 704.896.9989 Fax: 704.896.1935 ** Please "Reply All" To Email Correspondence **
_________________________________________________________ SprinklerForum mailing list: https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org To unsubscribe send an email to [email protected]
