We've been asked to provide the AHJ with something in writing stating adding 
(1) head to a non-sprinkled building for the gas storage room in a dentist 
office meets section 903.3.8 in the 2018 IBC, and specifically 903.3.8.3 and 
903.3.8.5. Any pointers?
I can't imagine doing full shop drawings, calc one head, as a plan B.....

Brian Harris, CET
BVS Systems Inc.
Design Manager
bvssystemsinc.com<http://bvssystemsinc.com/>
Phone: 704.896.9989
Fax: 704.896.1935

** Please "Reply All" To Email Correspondence **


_________________________________________________________
SprinklerForum mailing list:
https://lists.firesprinkler.org/list/sprinklerforum.lists.firesprinkler.org
To unsubscribe send an email to [email protected]

Reply via email to