AMERICAN FIRE SPRINKLER ASSOCIATION
9696 Skillman, #300 Dallas, Texas 75243
Ph: (214) 349-5965 Fax: (214) 343-8898
-----------------
TECHNICAL UPDATE
JANUARY 5, 2007
-----------------
TECHNICAL UPDATE AND TECHTALK INDEX JULY-DECEMBER 2006
PUBLICATION
TOPIC STANDARD
Technical Update 07/05 Sprinklers in Combustible Concealed Spaces
13R/02
Technical Update 07/12 UL Listing of Cla-Val Pressure Reducing
Valve UL
Technical Update 07/19 Fire Pump Supply to Standpipe & Hose System
14/02
Technical Update 07/26 Fire Pump Test Header Piping Arrangement
20/99
TechTalk July 2006 Maximum Protection Area of Coverage for
Unoccupied Attics; Impact of Ceiling Pockets Less Than 12-inches;
Fire Department Connection Drainage
Technical Update 08/03 Control Valve and FDC Piping 13/02
Technical Update 08/10 Foam Water Deluge System 16/03
Technical Update 08/31 Fire Sprinklers Under Metal Grate Flooring
13/02
TechTalk August 2006 Trophy Cases; Steel Column Protection; Water
Supply Source for NFPA 13D Systems
Technical Update 09/06 Technical Update/Tech Talk Index January -
June 2006
Technical Update 09/16 ESFR Light Fixture Obstruction 13/99
Technical Update 09/27 13R or 13D System in Prison Facility 13/IBC
TechTalk September 2006 Fire Pumps-Vertical In-line and the Suction
Pipe; ESFR Non-Continuous Obstruction Width; Exterior
Roofs, Canopies, or Porte-Cochere
Technical Update 10/04 Preaction Foam System Remote Area 16/30
Technical Update 10/12 Column Protection-Rubber Tire Storage 13/02
Technical Update 10/26 NICET's Extreme Change
TechTalk October 2006 Listed Heat Tracing - 2007 Ed.; Lintels for
Compartments and Small Rooms-2007 Ed.; Room Design for Storage-2007 Ed.
Technical Update 11/02 Fire Sprinklers in Non-combustible Above
Ceiling Space IBC
Technical Update 11/08 Non-combustible Sprinklers 13/02
Technical Update 11/29 Unlisted Fire Pump 20/03
TechTalk November 2006 NICET Clarifies Position on NICET III;
Sprinklers for Exterior Balconies; NFPA 25-Delay in Release-2007 Ed.
Technical Update 12/08 Earthquake Bracing for CPVC in 13R
Application 13R/02
Technical Update 12/13 Ball Valve 13R/07
Technical Update 12/27 Wood Crates 13/02
TechTalk December 2006 NFPA 13-Tentative Interim Amendment (TIA)
for Dry Pipe Systems-2002 Ed.; 13R Longitudinal Bracing for CPVC
Pipe; Hydrostatic Testing of the Fire Department Connection
------------
Technical Update is prepared by the Technical Services Dept. of the
AFSA: Vice President of Engineering and Technical Services Roland
Huggins, a PE registered in fire protection engineering; Phill Brown,
a NICET IV certified automatic sprinkler technician and NFPA
Certified Fire Protection Specialist (CFPS) and Tom Wellen, a degreed
fire protection engineering technologist. This is provided with the
understanding that the AFSA assumes no liability for this opinion or
actions taken on it and they are not to be considered the official
position of the NFPA or its technical committees.
Copyright (c) 2007, American Fire Sprinkler Association. All Rights
Reserved
-------------
_______________________________________________
Sprinklernotes mailing list
[email protected]
http://lists.firesprinkler.org/mailman/listinfo/sprinklernotes