Technical Update Index (June 17 – December 16, 2019)

 

 

Issue, Topic, Standard

6/17/19 Combustible Canopies not Accessible from Within Dwelling-13R

6/24/19 Concealed Spaces and Using Insulation as the Ceiling or Roof-13

7/1/19 NFPA 13D and Sprinkler Protection in Open and Attached Patios-13D

7/8/19 Water Delivery Times for Dry-systems-13

7/15/19 ESFR Sprinklers and Obstructions Below the Deflectors-13

7/22/19 Vertical Obstructions 18 inches or Less Below the Sprinkler Deflector-13

7/29/19 Sprinkler Protection Requirements for Non-Combustible Exterior Canopies 
Used for Outside Dining-13

8/5/19 Galvanized Piping Requirements for Dry and Preaction Sprinkler Systems-13

8/12/19 Intermediate Temperature Sprinklers Installed Throughout a Light Hazard 
Occupancy-13

8/19/19 Painted Escutcheons and the Requirements for Replacement-25

8/26/19 Small Design Areas and Adding Additional Flow-13

9/9/19 ESFR Sprinklers and Obstructed Combustible Construction-13

9/16/19 Sprinkler Temperature Ratings for Attics-13

9/23/19 Spray Foam Insulation in Combustible Concealed Spaces-13

9/30/19 Omitting Sprinklers in Atrium Areas-13

10/1/19 Using Joint Compound or Teflon Tape-13

10/14/19 Defining “New” for Valves, Devices, and Sprinklers-13

10/21/19 Slatted Ceilings and Sprinkler Protection-13

10/28/19 Disconnects for Electric Fire Pump Controllers-20

11/4/19 Closets Located Under Stairs-13D

11/11/19 Seismic Requirements for a Seismic Design Category B Building-13

11/18/19 Mixing of Sprinklers with Different Temperature Ratings in The Same 
Compartment-13

11/25/19 Antifreeze Systems with Backflow Preventers-13

12/2/19 Vertical Openings and Draft Stops-13

12/9/19 Residential Sidewalls and Soffits-13

12/16/19 Sprinklers on Entryways in NFPA 13R-13R