Well friends I managed to get most everything repaired and Rosey, my 
Ruby conversion, back in operating condition.  I ran it twice and had two 
very satisfying runs of 25 and 27 minutes on blocks.  I imagine a little 
tweeking of the gas valve could extend the run a little.  I am Ready for 
Diamondhead!!!!
     I removed all the paint from the smoke box door that got blistered and 
re-painted it, after which I baked it in the kitchen oven at 425 degrees for 
two hours. The paint job came out great and looks good.  I also added a heat 
shield inside the smoke box door with a disk of .010 brass and some 
insulation. It seems to help keep the door a little cooler.   The smoke box 
cover is still slightly blistered, but it is too much of a hassle to take it 
all apart to repaint this close to departure.  I hope you all will not look 
to close or be too critical as this is my first try.
    All in all it was a good day steamin'!!!!!!
Salty
  

Reply via email to