Good evening List,

Just finished registering on-line for the NSS. And I made my hotel
reservations yesterday. To top that off I've actually made progress on the
coal-fired Billy. In the past two days the grate and lower portion of the
firebox got fabricated. The lower portion is a stainless steel box that
attaches to the copper part of the firebox and attaches to the loco frame to
support the aft end of the boiler assembly. Now I can install the boiler
onto the frame properly and start working on the piping for the axle pump
and on the steam plumbing. Goal is to have it burning coal and in steam at
the NSS.

Steve
-------------- next part --------------
An HTML attachment was scrubbed...
URL: 
http://postfix.45mm.com/pipermail/sslivesteam/attachments/20090514/261d2705/attachment.html
_______________________________________________
SSLiveSteam mailing list
Send messages: [email protected]
Cancel subscription: http://postfix.45mm.com/mailman/listinfo/sslivesteam
Rules: http://www.45mm.com/sslivesteam_guide.html

Reply via email to