Hello fellow Stonehenge committers,

As we get prepared to move all the existing code from contrib to trunk, I will 
like to start a thread to define the goals and exit criteria for the next 
milestone.

Here are a few suggestions - please help in solidifying these over the next 
couple of days so that we can come to an agreed set of goals, exit criteria and 
timeline by the end of this week (please excuse if there are more structured 
ways of doing/defining these at Apache - we are still learning our ropes over 
here):


-          All the contributions are moved over to the new tree structure and 
they can be independently downloaded and build

-          Documentation and install instructions for each platform are 
uploaded on the wiki page

-          Each individual contribution has been independently tested and 
verified by some other committer who has not contributed to that particular 
branch. Do we need some kind of a sign-off mechanism for this?

-          Interoperability between individual contribution is achieved and can 
be tested and verified. Goal is to be able use different components from 
multiple contributions to create a heterogeneous, multi-tier application 
running on multiple platforms (for example, configure the front-end from one 
contribution with the backend of another contribution) At the minimum, we 
should try to achieve the scenarios that were demo'ed last summer by WSO2 and 
Microsoft [1].

-          List of bugs identified and fixed in various contributions to 
achieve the above

I think we should set-up an exit date of March 31st for this milestone.

Thanks
Kamal

[1] 
http://video.msn.com/video.aspx?mkt=en-us&vid=7019fbb8-4d12-4f56-93a1-a39b9d2ccb00

Reply via email to