Drew, I'd like to get CXF and/or Metro code also done before we do a full
release.

Dan/Harold, is that a realistic thing? I think we can help with refactoring
the Java code to be common and Axis2/WSAS to be separated.

Sanjiva.

On Sat, Feb 21, 2009 at 4:10 AM, Abu Obeida Bakhach <
[email protected]> wrote:

> Today is the 20th of Feb. Do we really 40 days to do these tasks?
>
> I think Drew is close ( or already done?) moving the code to contrib.. I am
> blocked by few things but should have my PHP install working out pretty
> soon.
>
> Who is willing to test the interop part between the contributions?
>
> Thanks,
>
>
> -----Original Message-----
> From: Kamaljit Bath [mailto:[email protected]]
> Sent: Tuesday, February 17, 2009 12:17 PM
> To: [email protected]
> Subject: Defining the next milestone
>
> Hello fellow Stonehenge committers,
>
> As we get prepared to move all the existing code from contrib to trunk, I
> will like to start a thread to define the goals and exit criteria for the
> next milestone.
>
> Here are a few suggestions - please help in solidifying these over the next
> couple of days so that we can come to an agreed set of goals, exit criteria
> and timeline by the end of this week (please excuse if there are more
> structured ways of doing/defining these at Apache - we are still learning
> our ropes over here):
>
>
> -          All the contributions are moved over to the new tree structure
> and they can be independently downloaded and build
>
> -          Documentation and install instructions for each platform are
> uploaded on the wiki page
>
> -          Each individual contribution has been independently tested and
> verified by some other committer who has not contributed to that particular
> branch. Do we need some kind of a sign-off mechanism for this?
>
> -          Interoperability between individual contribution is achieved and
> can be tested and verified. Goal is to be able use different components from
> multiple contributions to create a heterogeneous, multi-tier application
> running on multiple platforms (for example, configure the front-end from one
> contribution with the backend of another contribution) At the minimum, we
> should try to achieve the scenarios that were demo'ed last summer by WSO2
> and Microsoft [1].
>
> -          List of bugs identified and fixed in various contributions to
> achieve the above
>
> I think we should set-up an exit date of March 31st for this milestone.
>
> Thanks
> Kamal
>
> [1]
> http://video.msn.com/video.aspx?mkt=en-us&vid=7019fbb8-4d12-4f56-93a1-a39b9d2ccb00
>



-- 
Sanjiva Weerawarana, Ph.D.
Founder & Director; Lanka Software Foundation; http://www.opensource.lk/
Founder, Chairman & CEO; WSO2, Inc.; http://www.wso2.com/
Member; Apache Software Foundation; http://www.apache.org/
Visiting Lecturer; University of Moratuwa; http://www.cse.mrt.ac.lk/

Blog: http://sanjiva.weerawarana.org/

Reply via email to