Drew, I'd like to get CXF and/or Metro code also done before we do a full release.
Dan/Harold, is that a realistic thing? I think we can help with refactoring the Java code to be common and Axis2/WSAS to be separated. Sanjiva. On Sat, Feb 21, 2009 at 4:10 AM, Abu Obeida Bakhach < [email protected]> wrote: > Today is the 20th of Feb. Do we really 40 days to do these tasks? > > I think Drew is close ( or already done?) moving the code to contrib.. I am > blocked by few things but should have my PHP install working out pretty > soon. > > Who is willing to test the interop part between the contributions? > > Thanks, > > > -----Original Message----- > From: Kamaljit Bath [mailto:[email protected]] > Sent: Tuesday, February 17, 2009 12:17 PM > To: [email protected] > Subject: Defining the next milestone > > Hello fellow Stonehenge committers, > > As we get prepared to move all the existing code from contrib to trunk, I > will like to start a thread to define the goals and exit criteria for the > next milestone. > > Here are a few suggestions - please help in solidifying these over the next > couple of days so that we can come to an agreed set of goals, exit criteria > and timeline by the end of this week (please excuse if there are more > structured ways of doing/defining these at Apache - we are still learning > our ropes over here): > > > - All the contributions are moved over to the new tree structure > and they can be independently downloaded and build > > - Documentation and install instructions for each platform are > uploaded on the wiki page > > - Each individual contribution has been independently tested and > verified by some other committer who has not contributed to that particular > branch. Do we need some kind of a sign-off mechanism for this? > > - Interoperability between individual contribution is achieved and > can be tested and verified. Goal is to be able use different components from > multiple contributions to create a heterogeneous, multi-tier application > running on multiple platforms (for example, configure the front-end from one > contribution with the backend of another contribution) At the minimum, we > should try to achieve the scenarios that were demo'ed last summer by WSO2 > and Microsoft [1]. > > - List of bugs identified and fixed in various contributions to > achieve the above > > I think we should set-up an exit date of March 31st for this milestone. > > Thanks > Kamal > > [1] > http://video.msn.com/video.aspx?mkt=en-us&vid=7019fbb8-4d12-4f56-93a1-a39b9d2ccb00 > -- Sanjiva Weerawarana, Ph.D. Founder & Director; Lanka Software Foundation; http://www.opensource.lk/ Founder, Chairman & CEO; WSO2, Inc.; http://www.wso2.com/ Member; Apache Software Foundation; http://www.apache.org/ Visiting Lecturer; University of Moratuwa; http://www.cse.mrt.ac.lk/ Blog: http://sanjiva.weerawarana.org/
