Hi Natalia, both your definitions and the output are correct. The output gives the total number of vehicles not the average. If all your edges are consecutive you might want to define the vehicles to run all the edges to have less insertions. Something like this:
<flow id=“1" type="1" from="1" to=“10" begin="75600" end="79200" vehsPerHour=“100" departLane="best" departSpeed="max"/> <flow id=“2" type="1" from=“3" to=“10" begin="75600" end="79200" vehsPerHour=“80" departLane="best" departSpeed="max"/> <flow id=“3" type="1" from=“3" to=“4" begin="75600" end="79200" vehsPerHour="20" departLane="best" departSpeed="max"/> <flow id=“4" type="1" from=“7" to=“10" begin="75600" end="79200" vehsPerHour=“50" departLane="best" departSpeed="max"/> <flow id=“5" type="1" from=“9" to=“10" begin="75600" end="79200" vehsPerHour=“20" departLane="best" departSpeed="max"/> Best regards, Michael Am 03.11.18 um 16:21 schrieb Natalia Liora: > Hello, > > I want to run a simulation in which I have 10 road segments (edges). > Along specific edges I want to define that different number of vehicles > run each edge. > > In rou.xml file I define the above flows as following > > <flow > id=“1"type="1"from="1"to=“2"begin="75600"end="79200"vehsPerHour=“100"departLane="best"departSpeed="max"/> > <flow > id=“2"type="1"from=“3"to=“4"begin="75600"end="79200"vehsPerHour=“200"departLane="best"departSpeed="max"/> > <flow > id=“3"type="1"from=“5"to=“6"begin="75600"end="79200"vehsPerHour="180"departLane="best"departSpeed="max"/> > <flow > id=“4"type="1"from=“7"to=“8"begin="75600"end="79200"vehsPerHour=“230"departLane="best"departSpeed="max"/> > <flow > id=“5"type="1"from=“9"to=“10"begin="75600"end="79200"vehsPerHour=“250"departLane="best"departSpeed="max"/> > > With the above flows I want to define the following > from edge 1to 2 100 vehicles running. In the following, the vehicles > increase to 200 until the edge 4. Then, the vehicles decrease to 180 > until the edge 6 etc. > > I understand that with the above flows I do not get the desired vehicle > flows since in the summary output I get that 960 vehicles have been > loaded while the real average number of loaded vehicles should be 192. > > Could you please tell me how I have to define the flows? > > Thank a lot > > Natalia > > _______________________________________________ > sumo-user mailing list > [email protected] > To change your delivery options, retrieve your password, or unsubscribe from > this list, visit > https://www.eclipse.org/mailman/listinfo/sumo-user >
signature.asc
Description: OpenPGP digital signature
_______________________________________________ sumo-user mailing list [email protected] To change your delivery options, retrieve your password, or unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
