Hi!
 
I want to implement a lane mergy situation that changes from 3-lane to 2-lane. 
It is divided into 2 edges using 3 junctions, and the lanes of each edge are 
set as 3 lines and 2 lines. 
The index of the first edge consists of 0, 1, 2 from the bottom, and the index 
of the second edge also consists of 0, 1 from the bottom. 
When joining from the first edge to the second edge, the 'index1 line' of the 
first edge and the 'index0 line' of the second edge are connected. 
 
I want the 'index0 line' of the first edge to be connected with the 'index0 
line' of the second edge. 
If you look at the attached photo, the second edge is attached to the top of 
the first edge, and I want it to be attached to the bottom. 
 
I'd appreciate it if you could tell me how to do it. 
Thanks!
_______________________________________________
sumo-user mailing list
sumo-user@eclipse.org
To unsubscribe from this list, visit 
https://www.eclipse.org/mailman/listinfo/sumo-user

Reply via email to