In _move_ mode, hold _shift_ key and click on the edge near the node between the edges, you will be able to create a node with an S or E on it. Move that node and you should be able to align the lanes. Remember to config the connections at that merging point.
Qichao On Tue, May 10, 2022 at 5:38 AM 허송무 <[email protected]> wrote: > Hi! > > > > I want to implement a lane mergy situation that changes from 3-lane to > 2-lane. > > It is divided into 2 edges using 3 junctions, and the lanes of each edge > are set as 3 lines and 2 lines. > > The index of the first edge consists of 0, 1, 2 from the bottom, and the > index of the second edge also consists of 0, 1 from the bottom. > > When joining from the first edge to the second edge, the 'index1 line' of > the first edge and the 'index0 line' of the second edge are connected. > > > > I want the 'index0 line' of the first edge to be connected with the > 'index0 line' of the second edge. > > If you look at the attached photo, the second edge is attached to the top > of the first edge, and I want it to be attached to the bottom. > > > > I'd appreciate it if you could tell me how to do it. > > Thanks! > _______________________________________________ > sumo-user mailing list > [email protected] > To unsubscribe from this list, visit > https://www.eclipse.org/mailman/listinfo/sumo-user >
_______________________________________________ sumo-user mailing list [email protected] To unsubscribe from this list, visit https://www.eclipse.org/mailman/listinfo/sumo-user
